港珠澳大桥隧道沉管安装定位及姿态监测技术
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
重点介绍了针对港珠澳大桥海底沉管对接过程中水下精密定位及姿态监测技术方法,采用了水上RTK定位与水下姿态监测技术相结合,并实时监测测量塔挠度,通过三维坐标转换实现了高精度的对接定位及姿态监测,开发可视化仿真模拟软件,指导沉管水下对接。简要介绍了安装定位过程的实施步骤、关键工序和定位精度分析。
This paper mainly introduce the key points on underwater tunnel tube positioning and posture monitoring of GANG-ZHU-AO Bridge,a combining method of above water-level positioning technology RTK GPS and under watet posture-monitoring technology and real-time measuring of the deflection of surveying tower.By coordinates transformation,we carry out the precise positioning and posture-monitoring of tunnel tubes,and develop the visual simulation software to guide the underwater jointing of tubes.The paper also briefly introduce the key steps and key process control and accuracy anylasis during installation and positioning.
引文
[1]张强,高宝峰.港珠澳非通航孔桥型方案分析[J].桥梁建设,2009(4):38-40.
    [2]徐军,刘磊,刘晓东.港珠澳大桥设计技术标准研究——设计寿命的确定及对策[J].中外公路,2011(5):136-140.
    [3]李英,陈越.港珠澳大桥岛隧工程的意义及技术难点[R]//第20届全国结构工程学术会议特邀报告,2011.
    [4]王兴铎.水下沉管隧道的发展和施工技术[J].中国铁路,2001(5):48-50.
    [5]隋海琛,杨鲲,张彦昌,等.“南海一号”打捞过程中的水下定位和姿态监测[J].水道港口,2009(2):17-21.
    [6]杨文武,毛儒,曾楚坚,等.香港海底沉管隧道工程发展概述[J].现代隧道技术,2008(增刊):41-46.
    [7]陈韶章.沉管隧道设计与施工[M].北京:科学出版社,2008.
    [8]缪丽,付辉,郭新蕾,等.港珠澳大桥岛隧工程施工过程三维仿真[J].南水北调与水利科技,2011(3):71-74.
    [9]迪军,熊伟.港珠澳大桥工程坐标系设计[J].测绘通报,2012(1):53-55.
    [10]孔祥元.大地测量学基础[M].武汉:武汉大学出版社,2010.
    [11]侯兴民,杨学山.实时测量桥梁挠度[J].地震工程与工程振动,2002(1):67-72.
    [12]黑志坚,周秋生,曲建光,等.RTK-GPS测量成果的精度估计及应用探讨[J].哈尔滨工业大学学报,2006(8):1295-1298.
    [13]邓妍.RTK-GPS定位精度研究[C]//2002全国测绘仪器综合学术年会.长春,2002.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心