引文
[1]张顶立,王梦恕,高军.复杂围岩条件下大跨隧道修建技术研究[J].岩石力学与工程学报,2003,22(2):290-296.(Zhang Dingli,Wang Mengshu,GaoJun.Construction technique of large-spanned tunnel un-der condition of complicated surrounding rocks[J].Chinese Journal of Rock Mechanics and Engineering,2003,22(2):290-296.(in Chinese))
[2]时亚昕,陶德敬,王明年.大断面浅埋暗挖隧道施工引起的地表移动及变形预测[J].岩土力学,2008,29(2):465-470.(Shi Yaxin,Tao Dejing,Wang Mingnian.Prediction of ground surface movementand deformation in constructing large cross-section tun-nel by shallow-burying and hidden-digging method[J].Rock and Soil Mechanics,2008,29(2):465-470.(inChinese))
[3]李术才,朱维申,陈卫忠.弹塑性大位移有限元方法在软岩隧道变形预估系统研究中的应用[J].岩石力学与工程学报,2002,21(4):466-470.(LiShucai,Zhu Weishen,Chen Weizhong.Application ofelastoplastic large displacement finite element method tothe study of deformation prediction of soft rock tunnel[J].Chinese Journal of Rock Mechanics and Engineer-ing,2002,21(4):466-470.(in Chinese))
[4]冯仲仁,张兴才,张世雄,等.大冶铁矿巷道变形监测研究[J].岩石力学与工程学报,2004,23(3):483-487.(Feng Zhongren,Zhang Xingcai,Zhang Shix-iong,et al.Monitoring study on drift deformation of Dayeiron mine[J].Chinese Journal of Rock Mechanics andEngineering,2004,23(3):483-487.(in Chinese))
[5]陈耕野,刘斌,万明富,等.韩家岭大跨度公路隧道应力监测分析[J].岩石力学与工程学报,2005,24(增刊2):5509-5515.(Chen Gengye,Liu Bin,Wan Mingfu,et al.Analysis of stress monitoring of alarge-span highway tunnel in Hanjialing mountain[J].Chinese Journal of Rock Mechanics and Engineering,2005,24(Supp.2):5 509-5 515.(in Chinese))
[6]蒋树屏,刘洪洲,鲜学福.大跨度扁坦隧道动态施工的相似模拟与数值分析研究[J].岩石力学与工程学报,2000,19(5):567-572.(Jiang Shubing,LiuHongzhou,Xian Xuefu.Dynamic construction of the an-alog simulation and the numerical analysis research inlarge span oblate tunnel[J].Chinese Journal of RockMechanics and Engineering,2000,19(5):567-572.(in Chinese))
[7]胡学兵,乔玉英.小团山大断面公路隧道稳定性数值模拟分析[J].重庆交通学院学报,2002,21(4):16-19.(Hu Xuebing,Qiao Yuying.The numerical val-ue analysis of Xiaotuanshan big segment highway tunnel`s stability[J].Journal of Chongqing Jiaotong Universi-ty,2002,21(4):16-19.(in Chinese))
[8]马富奎,刘涛,李利平.浅埋大跨隧道施工力学响应模拟与监测分析[J].岩土力学,2006,27(增):339-343.(Ma Fukui,Liu Tao,Li Liping.Excavationmechanics simulation and site monitoring analysis oflarge-span shallow tunnel[J].Rock and Soil Mechan-ics,2006,27(Supp.),339-343.(in Chinese))
[9]J.Shin,Y.Choi.Model testing for pipe-reinforcedtunnel heading in a granular soil[J].Tunnelling andUnderground Space Technology,2008,23(3):241-250.
[10]陈卫忠,王辉,田洪铭.浅埋破碎岩体中大跨隧道断面扁平率优化研究[J].岩石力学与工程学报,2011,30(7):1 389-1 395.(Chen Weizhong,WangHui,Tian Hongming.Study of flat ratio optimization oflarge-span tunnel section in shallow broken rock mass[J].Chinese Journal of Rock Mechanics and Engineer-ing,2011,30(7):1 389-1 395.(in Chinese))
[11]季毛伟,吴顺川,高永涛,等.双连拱隧道施工监测及数值模拟研究[J].岩土力学,2011,32(12):3 787-3 795.(Ji Maowei,Wu Shunchuan,Gao Yong-tao,et al.Construction monitoring and numerical sim-ulation of multi-arch tunnel[J].Rock and Soil Me-chanics.2011,32(12):3 787-3 795.(in Chinese))
[12]张黎明,郑颖人,王在泉,等.有限元强度折减法在公路隧道中的应用探讨[J].岩土力学,2007,28(1):97-106.(Zhang Liming,Zheng Yingren,WangZaiquan,et al.Finite element strength reduction in thehighway tunnel[J].Chinese Journal of Rock and SoilMechanics,2007,28(1):97-106.(in Chinese))
[13]程选生,郑颖人,田瑞瑞.隧道围岩结构地震动稳定性分析的动力有限元强度折减法[J].岩土力学,2011,32(4):1 241-1 248.(Cheng Xuansheng,Zheng Yingren,Tian Ruirui.Dynamic finite elementstrength reduction method of earthquake stability analy-sis of surrounding rock of tunnel[J].Chinese Journalof Rock and Soil Mechanics,2011,32(4):1 241-1248.(in Chinese))
[14]黄宏伟,徐凌.大风垭口岩石公路隧道围岩及初期支护变形与内力研究[J].岩石力学与工程学报,2004,23(1):44-52.(Huang Hongwei,Xu Ling.Study on deformation and internal force of surroundingrocks and initial support in Dafengyakou rock road tun-nel[J].Chinese Journal of Rock Mechanics and Engi-neering,2004,23(1):44-52.(in Chinese))