仁阁隧道软硬岩石交汇地段塌方成因及其处理
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
隧道施工经常会遇到软硬岩石交汇的地段,极易引发隧道塌方。结合仁阁隧道软硬岩石交汇地段塌方工程实例,探讨了利用拱顶架设工字钢梁并配合超前注浆小导管支护进行塌方处理的施工技术要点。
Due to the different degrees of weathering and the tectonic structures of the rock mass,the non-uniform strength in the rock mass is commonly encountered in the tunneling engineering.The variation of the rock mass strength might cause great difficulties for the tunnel construction.This paper presents a case study of mitigation of a large scale tunnel collapse in the Renge Highway Tunnel of Shuang-Yong Expressway in Longyan City,Fujian Province.The collapse occurred in August 2010 at the soft rock mass zone.The mitigation techniques involved using steel H beams placing at the arch of the tunnel and using small diameter casing in the ahead-grouting supporting.
引文
[1]公路隧道施工技术规范(JTJ042-94)[S].
    [2]工程岩体分级标准(GB50218-1994)[S].
    [3]吴旻硕.隧道围岩强度不均地段塌方成因及其处理方法[J].石家庄铁道学院学报,2007(9).
    [4]田洪义.地质雷达探测技术在象山隧道岩溶段的应用[D].第九届海峡两岸隧道与地下工程学术及技术研讨会,2010(7).
    [5]王生毅.地质雷达在地震灾后重建隧道中的应用[J].城市建设,2010(10).
    [6]游祖群.安康至毛坝高速公路天生桥隧道塌方处理技术[J].水利与建筑工程学报,2010(6).
    [7]许占良.板岩地层超大断面隧道塌方处理对策[J].铁道标准设计,2013(3).

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心