摘要
为分析高速铁路高架线列车运行对既有线路基影响,建立桥墩—大地—既有线路基有限元模型,结合测试验证模型可靠性,分析不同行车条件、不同两线距离条件下既有线路基应力状态,预测高架线和既有线列车同时运行条件下累计沉降变形。研究结果表明:城际高速列车运行对既有线路基应力状态和累计变形影响很小,桥墩与既有线距离按限界控制即可满足要求。
In order to investigate the impact of train running on elevated bridge of high-speed railway on existing railway subgrade,the pier-soil-subgrade finite element model was established of which the reliability was demonstrated based on test deta.First,the stress state of the existing railway under different traffic conditions and different line distance was analyzed.Then,the cumulative settlement deformation under traffic loading of high speed train and low speed train was predicted.The results show that the state of stress and accumulated deformation of existing railway subgrade induced by running trains on elevated high-speed railway bridge is very little,and the distance between the pier and the existing railway determined by clearance control can meet the requirements.
引文
[1]边学成,曾二贤,陈云敏.列车交通荷载作用下软土路基的长期沉降[J].岩土力学,2009,29(11):2990-2996.BIAN Xuecheng,ZENG Erxian,CHEN Yunmin.Longterm settlements of soft soil ground induced by train traffic loadings[J].Rock and Soil Mechanics,2009,29(11):2990-2996.
    [2]董亮,蔡德钩,叶阳升,等.列车循环荷载作用下高速铁路路累积变形预测方法[J].土木工程学报,2010,43(6):100-108.DONG Liang,CAI Degou,YE Yangsheng,et al.A method for predicting the cumulative deformation of high-speed railway subgrades under cyclic train loads[J].China Civil Engineering Journal,2010,43(6):100-108 .
    [3]刘明,黄茂松,李进军.地铁荷载作用下饱和软粘土的长期沉降分析[J].地下空间与工程学报,2006,2(5):813 -817.LIU Ming,HUANG Maosong,LI Jinjun.Long-term settlement of saturated soft clay under subway loading[J].Chinese Journal of Underground Space and Engineering,2006,2(5):813-817.
    [4]JinChun CHAI,MIURA N.Trafic-load-induced permanent deformation of road on soft subsoil[J].Journal of Geoteehnical and Geoenvironmental Engineering,2002(10):907-916.
    [5]肖军华,周顺华,韦凯.列车振动荷载下铁路粉土路基的长期沉降问题[J].浙江大学学报:工学版,2010,44(10):1912-1918.XIAO Junhua,ZHOU Shunhua,WEI Kai.Long term settlement of railroad silt subgrade induced by train loading[J].Journal of Zhejiang University:Engineering Science,2010,44(10):1912-1918.
    [6]邓天天,吴斌,周援衡.循环动载作用下改良土路基累积塑性变形的数值模拟与试验研究[J].铁道科学与工程学报,2010,7(1):59-63.DENG Tiantian,WU Bin,ZHOU Yuanheng.Numerical simulation and experimental research on accumulative plastic deformation of improved soil roadbed under cyclic dynamic loads[J].Journal of Railway Science And Engineering,2010,7(1):59-63.
    [7]中华人民共和国铁道部.高速铁路设计规范[S].北京:中国铁道出版社,2007.The Ministry of Railways of the People’s Republic of China.Code for design of high speed railway[S].2009.
    [8]廖振鹏.局部透射边界的精度[J].地震工程与工程振动,1993,13(3):1-6.LIAO Zhenpeng.Precision of local transmitting boundary[J].Earthquake Engineering and Engineering Vibration,1993,13(3):1-6.
    [9]王峰.沪宁高铁与邻近既有线振动相互影响的测试与分析[J].北京交通大学学报,2012,36(4):12-18.WANG Feng.Test and analysis for vibration influence between Hu-Ning high-speed railway and adjacent existing line[J].Journal of Beijing Jiaotong University,2012,36(4):12-18.
    [10]Lid S E T.Cumulative plastic deformation for fine—grained subgrade Soils[J].Journal of Geotechnical Engineering,1996,122(12):1006-1013.
    [11]Hyodo M,Yasuhara K,Murata H.Deformation analysis of the soft clay foundation of low embankment road under traffic loading[C]//Proceeding of the 31st Symposium of Japanese Society of Soil Mechanics and Foundation Engineering.1996:27-32.
    [12]Kutara K,Miki H,Mashita,et al.Settlement and counterm easures of the road with low embankment on soft ground[J].Technical Report of Civil Engineering,JSCE,1980,22(8):13-16.
    [13]Fujikawa K,Miura N,Beppu I.Field investigation on the setlement of low embankment road due to traffic load and its prediction[J].Soils and Foundations,1996,36(4):147-153.
    [14]Monismith C L,Ogawa N,Freeme C R.Permanent deformation characteristics of subsoil due to repeated loading[J].Transportation Research Record,1975.537:1-17.
    [15]沈珠江.基于有效固结应力理论的粘土土压力公式[J].岩土工程学报,2000,22(3):353-356.SHEN Zhujiang.Earth pressure of clay based on effectiveconsolidation stress theory[J].Chinese Journal of Geotechnical Engineering,2000,22(3):353-356.