引文
[1]钱七虎,何川,晏启祥.隧道工程动力响应特性与汶川地震隧道震害分析及启示[C]//宋胜武.汶川大地震工程震害调查分析与研究.成都:中国岩石力学与工程学会,2009:608-618.QIAN Qi-hu,HE Chuan,YAN Qi-xiang.Analysis and investigation on seismic damages of projects subjected to Wenchuan earthquake[C]//SONG Sheng-wu.Study on Engineering Damage in Wenchuan Earthquake.Chengdu:Chinese Society for Rock Mechanics and Engineering,2009:608-618.
[2]张广洋.“5.12”汶川大地震与都汶公路隧道震害[C]//汶川大地震与四川公路隧道建设研讨会.成都:四川省公路学会隧道专业委员会,2008:4-8.ZHANG Guang-yang.Seismic damage of Du?Wen highway tunnel in Wenchuan earthquake[C]//Workshop on Sichuan Highway Construction and Wenchuan Earthquake.Chengdu:Sichuan Committee for Highway Tunnel,2008:4-8.
[3]李海清.隧道工程震害处治对策[C]//汶川大地震与四川公路隧道建设研讨会.成都:四川省公路学会隧道专业委员会,2008:12-17.LI Hai-qing.Measures of seismic damage to tunnels[C]//Workshop on Sichuan Highway Construction and Wenchuan Earthquake.Chengdu:Sichuan Committee for Highway Tunnel,2008:12-17.
[4]高波,王峥峥,袁松,等.汶川地震公路隧道震害启示[J].西南交通大学学报,2009,44(3):336-341.GAO Bo,WANG Zheng-zheng,YUAN Song,et al.Lessons learnt from damage of highway tunnels in Wenchuan earthquake[J].Journal of Southwest Jiaotong University,2009,44(3):336-341.
[5]姚浩,周红波,蔡来炳,等.软土地区土压盾构隧道掘进施工风险模糊评估[J].岩土力学,2007,28(8):1753-1756.YAO Hao,ZHOU Hong-bo,CAI Lai-bing,et al.Fuzzy synthetic evaluation on construction risk of EPBS during tunnelling in soft soil area[J].Chinese Journal of Rock and Soil Mechanics,2007,28(8):1753-1756.
[6]王梦恕.厦门海底隧道设计、施工、运营安全风险分析[J].施工技术,2005(增):1-4.WANG Meng-shu.Design,construction and operation safety risk analysis of the Xiamen subsea tunnel[J].Construction Technology,2005(S):1-4.
[7]王燕,黄宏伟,李术才.海底隧道施工风险辨识及其控制[J].地下空间与工程学报,2007,3(7):1261-1264.WANG Yan,HUANG Hong-wei,LI Shu-cai.Risk identification and handling during construction of subsea tunnel[J].Chinese Journal of Underground Space and Engineering,2007,3(7):1261-1264.
[8]苏燕,周健.隧道抗震风险评估初探[J].福州大学学报:自然科学版,2004,32(1):65-68.SU Yan,ZHOU Jian.The assessment of seismic risks of tunnel[J].Journal of Fuzhou University:Natural Science,2004,32(1):65-68.
[9]陈洁金,周峰,阳军生,等.山岭隧道塌方风险模糊层次分析[J].岩土力学,2009,30(8):2365-2370.CHEN Jie-jin,ZHOU Feng,YANG Jun-sheng,et al.Fuzzy analytic hierarchy process for risk evaluation of collapse during construction of mountain tunnel[J].Chinese Journal of Rock and Soil Mechanics,2009,30(8):2365-2370.
[10]苏永华,邹志鹏,赵明华.基于模糊集重心理论的岩体分类[J].岩土力学,2007,28(6):1118-1122.SU Yong-hua,ZOU Zhi-peng,ZHAO Ming-hua.Rock classification based on theory of barycenter of fuzzy set[J].Chinese Journal of Rock and soil Mechanics.2007,28(6):1118-1122.
[11]WANG Zheng-zheng,GAO Bo,JIANG Yuan-jun,et al.Investigation and assessment on mountain tunnels and geotechnical damage after the Wenchuan earthquake[J].Science in China Series E:Technological Sciences,2009,52(2):546-558.
[12]Wang W L,Wang T T,Su J J,et al.Assessment of damage in mountain tunnels due to the Taiwan Chi-Chi earthquake[J].Tunnelling and Underground Space Technology,2001,16(1):133-150.
[13]Hashash Y M A,Hook J J.Seismic design and analysis of underground structures[J].Tunnelling and Underground Space Technology,2001,16:247-293.
[14]洪选华.胶州湾海底隧道典型施工风险评估与研究[D].上海:同济大学,2008:26-27.HONG Xuan-hua.Risk evaluation and research for representative construction risk of a subsea tunnel below the Jiaozhouwan[D].Shanghai:Tongji University,2008:26-27.
[15]关宝树.隧道工程设计要点集[M].北京:人民交通出版社,2003:448-471.GUAN Bao-shu.Keypoints of tunnelling design[M].Beijing:Communication Press,2003:448-471.
[16]汪培庄,李洪兴.模糊系统理论与模糊计算机[M].北京:科学出版社,1996:57-68.WANG Pei-zhuang,LI Hong-xing.Theory of fuzzy system and fuzzy computer[M].Beijing:Science Press,1996:57-68.
[17]Karwowski.Applications of approximate reasoning in risk analysis[C]//Applications of Fuzzy Set Theory in Human Factors.New York:Elsevier,1986:1-4.
[18]郭亚军.综合评价理论、方法及应用[M].北京:科学出版社,2008:25-36.GUO Ya-jun.Theory,method and application of synthetic evaluation[M].Beijing:Science Press,2008:25-36.