基于植筋技术的码头新旧结构加固试验模拟
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
码头新旧结构如何联合承载是港口码头工程升级改扩建工作中的难点.以浙江沿海某板桩码头升级改造工程为例,通过环氧树脂种植钢筋的施工方案,对Ⅲ段码头新旧承台连接力进行了试验.同时为分析其加固改造效果、评价码头结构的安全现状,采用ABAQUS三维有限元软件,建立了Ⅲ段码头结构的三维静力数值分析模型.经计算,其植筋部位抗拔力能够抵抗结合面处的拉力,新旧结构连接部位结构安全稳定,表明采用植筋连接的增大截面法的加固方式对加固构件的损伤程度较小,且操作简单、可靠度高.
How to evaluate joint-bearing capacity between the new and the old wharf structures is very difficulty in the port engineering reconstruction upgrades. A sheet pile wharf upgraded coastal engineering in Zhejiang was exampled in this paper. Experimental study of the connecting capacity between the old and the new bearing platforms of the Ⅲ wharf was finished by the construction scheme of bonded rebar by using the epoxy resin. At the same time,three dimensional numerical simulation of the Ⅲ wharf structure was built by using the finite element software ABAQUS for analyzing the reinforcement effect and evaluating the security status of wharf structure. The results show that the bonded rebar area could resist the tensile forces of the interface,and the connection structure between the old and the new structures is security and stable. The reinforcement method of enlarging the cross section by using bonded rebar connection shows less damage on the strengthened beam,which has the advantage of simple operation and high reliability.
引文
[1]周新刚,王尤选,曲淑英.混凝土植筋锚固极限承载能力分析[J].工程力学,2002,19(6):82-86.
    [2]司伟建,周新刚,黄金枝,等.混凝土结构植筋粘结锚固性能的研究[J].建筑结构,2001,31(3):9-12.
    [3]张建荣,石丽忠.植筋锚固拉拔试验及破坏机理研究[J].结构工程师,2004,20(5):47-51.
    [4]杨建华.植筋锚固梁粘结锚固性能的试验研究[D].上海:同济大学,2004.
    [5]张建荣,吴进,杨建华,等.植筋搭接混凝土梁静力及疲劳受弯试验研究[J].建筑结构学报,2005,26(5):96-103.
    [6]闫锋,张惠英,杨军.植筋混凝土柱延性和耗能能力的试验研究[J].建筑结构,2005,35(3):18-20.
    [7]蒋程,管东芝,刑晨曦,等.植筋连接混凝土梁抗剪承载力试验研究[J].建筑技术,2011,42(7):653-654.
    [8]周新刚,司伟建.钢筋混凝土植筋锚固构件受低周反复荷载作用的恢复力特性[J].建筑结构,2002,32(8):38-40.
    [9]Liu Ying Li,Tao Li Xing,Huan Jun Hong,et al.Study of the anchorage seismic performance for Beam-Ends strengthened by bonded rebars[J].Advanced Materials Research,2014,3137(912):783-789.
    [10]Sun Hao,Liu Shi Lin,Li Xiao Gang.Test analysis of shear performance on young-old concrete interface between bonded rebar and groove[J].Applied Mechanics and Materials,2013,2733(438):235-239.
    [11]刘长青,陆洲导,李占鸿,等.火灾(高温)下植筋试件拉拨承载力试验研究[J].四川大学学报:工程科学版,2010,42(1):74-79.
    [12]中交四航工程研究院有限公司.JTJ 302—2006港口水工建筑物检测与评估技术规程[S].北京:人民交通出版社,2007.
    [13]天津港湾工程研究所,南京水利科学研究院.JTJ 270—98水运工程混凝土试验规程[S].北京:人民交通出版社,1999.
    [14]刘英利,陶立兴,蒋铁柱,等.梁端化学植筋加固钢筋锚固失效研究[J].世界地震工程,2014,30(1):34-40.
    [15]史三元,崔立杰.混凝土植筋群锚效应试验分析[J].煤炭工程,2014,46(1):129-131.
    [16]蔡洪滨,张东领.化学植筋在码头胸墙修复中的应用[J].水运工程,2012(8):200-203.
    [17]郑奕鹏,郭子雄,柴振岭,等.花岗岩石材植筋锚固性能试验[J].华侨大学学报(自然科学版),2014,35(2):88-92.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心