摘要
大多数隧道开挖地质情况复杂,地质灾害时常发生,单一的地质预报方法往往不能够比较全面地提供隧道掌子面前方的地质情况信息,这样一来可能造成地质灾害的漏报和误报.所以必须根据隧道的地质情况,采用2种或2种以上的预报方法进行隧道施工地质超前预报,相互验证,提供较为全面的地质预报信息.综合分析观音山隧道地质条件,地质预报组采用以地质调查法为基础,综合地震波反射法法和地质雷达法,三者相结合的方法对观音山隧道施工进行地质超前预报,取得了良好的效果,为隧道开挖提供了科学的指导和依据.
Most tunnels always confront the complex geology, and geological disasters happen unexpectedly. The geological predicting method, if only adopting single predicting method, would not be providing the complete geology information of tunnel face in advance, which would lead to the information prospecting missed and even wrong information. So we must adopt at least two or even more methods, if possible, to predict the tunnel geology information under construction; comparing the information provided to sort out the fairly complete geological predicting information. Based on the analyzed tunnel geology information of Guanyinshan, the geological prospecting team adopted the geology researching as the start point, and took the method of TSP and the method of geological radar, to make the geological information predicting of the Guanyinshan Tunnel constructing. It has made good effects in construction and provided scientific guidance and practical base.
引文
[1]刘志刚,赵勇.隧道隧洞施工地质技术[M].北京:中国铁道出版社,2001.LIU Zhigang,ZHAO Yong.Construction geological technique of tunnel[M].Beijing:China Railway Publishing House,2001.
    [2]宋先海,顾汉明,肖柏勋.我国隧道地质超前预报技术评述[J].地球物理学进展,2006,21(2):605-613.SONG Xianghai,GU Hanming,XIAO Boxun.Overview of tunnel geological advanced prediction in China[J].Progress in Geophysics,2006,21(2):605-613.
    [3]刘志刚,刘秀峰.TSP(隧道地震勘探)在隧道隧洞超前预报中的应用与发展[J].岩石力学与工程学报,2003,22(8):1399-1402.LIU Zhigang,LIU Xiufeng.TSP application and development in tunnel lead forecast[J].Chinese Journal of Rock Mechanics Engineering,2003,22(8):1399-1402.
    [4]曲海峰,刘志刚,朱合华.隧道信息化施工中综合超前地质预报技术[J].岩石力学与工程学报,2006,25(6):1246-1251.QU Haifeng,LIU Zhigang,ZHU Hehua.Technique of synthetic geologic prediction ahead in tunnel informational construction[J].Chinese Journal of Rock Mechanics Engineering,2006,25(6):1246-1251.
    [5]李天斌,孟陆波,朱劲,等.隧道超前地质预报综合分析方法[J].岩石力学与工程学报,2009,28(12):2429-2436.LI Tianbin,MENG Lubo,ZHU Jin,et al.Comprehensive analysis method advanced forecast of geology in tunnels[J].Chinese Journal of Rock Mechanics Engineering,2009,28(12):2429-2436.
    [6]闫长斌,徐国元.综合物探方法及其在复杂群采空区探测中的应用[J].湖南科技大学学报(自然科学版),2005,20(3):10-14.YAN Changbin,XU Guoyuan.Research of composite geophysical methods and its application in detection complicated group mined-out areas[J].Journal of Hunan University of Science and Technology(Natural Science Edition),2005,20(3):10-14.
    [7]赵杰华,谭捍华,罗强,等.综合物探在岩溶地区公路工程勘察中的应用[J].湖南科技大学学报(自然科学版),2008,23,(3):77-82.ZHAO Jiehua,TAN Hanhua,LUO Qiang,et al.Application of comprehensive physical exploration for engineering geological prospecting of highway in Karst area[J].Journal of Hunan University of Science and Technology(Natural Science Edition),2008,23(3):77-82.