摘要
针对时速200 km单线铁路32 m孔跨简支T梁的圆端形实体桥墩进行计算分析。在已定桥墩尺寸的前提下,侧重分析了墩身截面偏心系数e/s最大值随墩身高度、桥址处场地类别、地震烈度、桥墩整体刚度以及桥墩在线路平面上所处位置等因素变化的情况;同时还分析了在墩顶截面尺寸相同的条件下,不同的墩身坡率对e/s最大值的影响。最终得出在Ⅰ类场地土情况下,e/s最大值随着墩高的增加先增大后减小,且在墩高9 m左右时,e/s最大值出现极大值。而在Ⅲ类场地土情况下,同一坡率的桥墩其e/s最大值随着墩高的增加而增大;相同墩高时e/s最大值随着地震烈度的增大而增大;墩顶截面尺寸相同的桥墩,e/s最大值随着墩身坡率的减小而减小等结论。
In this paper,the round end piers of the 32 m span simply supported T-beam of single track railway of 200 km/h are calculated and analyzed.On the premise that the pier size has been confirmed,the maximum value of e/s is analyzed,changing by the factors of the height of piers,the stiffness of piers,site classification,earthquake intensity,stiffness of entire piers and the position of piers on the line;At the same time,the influence on the maximum value of e/s by different slope ratios of pier is also analyzed on the conditions that the cross section size of pier top is the same.Ultimately it is concluded that the maximum value of e/s first increases and then decreases in the case of Class Ⅰ site soil,and when the pier height reaches around 9 m,the maximum value of e/s is the biggest.Under the conditions of Class Ⅲ site soil,however,the maximum value of e/s increases with the increase of the pier height with same slope ratio;the maximum value of e/s increases with the increase of the seismic intensity at the same pier height;for the piers with same size of cross section of pier top,the maximum value of e/s decreases with the decrease of the slope ratio of pier body.
引文
[1]范立础.桥梁工程[M].北京:人民交通出版社,2001.Fan Lichu.Bridge Engineering[M].Beijing:China CommunicationsPress,2001.
    [2]李俭.桥梁墩台与基础工程[M].石家庄:石家庄铁道学院出版社,1993.Li Jian.Bridge Pier and Foundation Engineering[M].Shijiazhuang:Shijiazhuang Railway Institute Press,1993.
    [3]铁道第四勘测设计院.铁路工程设计技术手册(桥梁墩台)[M].北京:中国铁道出版社,2007.China Railway Siyuan Survey and Design Group Co.,LTD.TheHandbook of Railway Technology-Bridge Pier[M].Beijing:ChinaRailway Publishing House,2007.
    [4]GB50111-2006铁路工程抗震设计规范(2009年版)[S].GB 50111-2006 Code for Seismic Design of Railway Engineering(Version in 2009)[S].
    [5]TB10002.1-2005铁路桥涵设计基本规范[S].TB 10002.1-2005 Fundamental Code for Design on Railway Bridgeand Culvert[S].
    [6]TB10002.5-2005铁路桥涵地基和基础设计规范[S].TB 10002.5-2005 Code for Design on Subsoil and Foundation ofRailway Bridge and Culvert[S].
    [7]铁建设函[2005]285号,新建时速200公里客货共线铁路设计暂行规定[S].Document Tie Jian She[2005]No.285,About the Provisions of theDesign of New 200 km/h Mixed Passenger and Freight Railway[S].