为确保高风险隧道施工安全,如塌方、突水等安全事故的发生,采用超前预报避免地质灾害发生,保障隧道中不良地质段的安全施工显得尤为重要。结合宝兰客运专线秦安隧道工程,综合掌子面地质编录资料和TSP超前地质预报系统探测资料,解译探测资料时以地质编录资料为基础,以P波深度偏移剖面、提取的反射层和岩性参数图等P波数据资料为主,结合S波在液体中传播的特性综合判断,成功地预报了掌子面前方的断层(碎裂带)、软岩和地下水。通过预测结论和实际开挖情况相对比,分析了该方法的适应性及其特点,为隧道施工期超前预报中类似工程预报方法的选用具有一定的参考价值。
Adopting advanced prediction to avoid geological disasters,such as tunnel collapse,water burst and so on,it's particularly important to make sure bad geological section construction safely in high-risk tunnel. Combining geological resource of tunnel face and detection data of TSP advanced geological prediction system,interpreting the detection data,which should be based on the geological resource,in order to get results exactly give priority to taking into account P-wave data such as P-wave depth migration,reflector extraction diagram and lithologic paramete and the properties of S-wave propagate in the water etc,the fault crushed zones,soft rock and underground water in the front of tunnel face were successfully predicted. Contrasting prediction results and the actual excavation situation,the adaptability of this method and its characteristics were analyzed,and provide certain reference value for similar project of advanced prediction in tunnel construction.
引文
1 王梦恕.对岩溶地区隧道施工水文地质超前预报的意见.铁道勘察,2004;(1):7—18Wang Mengshu.Hydrogeology forecast for tunnel construction in Karst region.Railway Investigation&Surveying,2004;(1):7—18
    2 Alimoradi A,Moradzadeh A,Naderi R,et al.Prediction of geological hazardous zones in front of a tunnel face using TSP-203 and artificial neural networks.Tunnelling and Underground Space Technology,2008;(23):711—717
    3 杨果林,杨立伟.隧道施工地质超前预报方法与探测技术研究地下空间与工程学报,2006;(4):627—630Yang Guolin,Yang Liwei.Detection techniques and methods ofgeological advanced prediction in tunnel construction.Chinese Journal of Underground Space and Engineering,2006;(4):627—630
    4 毛正君,倪万魁,付晓刚.隧道超前地质灾害预报综述.中国地质灾害与防治学报,2007;(4):79—81Mao Zhengjun,Ni Wankui,Fu Xiaogang.Review on advanced geological hazards prediction of tunnel.The Chinese Journal of Geological Hazard and Control,2007;(4):79—81
    5 鲁光银,朱自强.TSP在公路隧道超前地质预报中的应用研究.水文地质工程地质,2005;(2):101—103Lu Guangyin,Zhu Ziqiang.Application of TSP in the expressway tunnel geological prediction.Hydrogeology and Engineering Geology,2005;(2):101—103
    6 齐甦.隧道地质超前预报技术与应用.北京:气象出版社,2010;93—121Qi Su.The Technique and application of tunnel advanced geology prediction.Beijing:China Meteorological Press,2010;93—121
    7 周运祥.TSP203超前预报系统在乌鞘岭特长隧道不良地质中的应用.铁道建设技术,2004;(1):45—47Zhou Yunxiang.The application of TSP203 advanced geological prediction in unfavorable geologic body of Wushaoling long tunne.Railway Construction Technology,2004;(1):45—47
    8 任光明,陈波,聂德新,等.深埋长隧道有害气体的预测与防治.中国地质灾害与防治学报,2001;(4):64—67Ren Guangming,Chen Bo,Nie Dexin,et al.Prediction and prevention of harmful gas in deep-lying long tunnel.The Chinese Journal of Geological Hazard and Control,2001;(4):64—67
    9 史广德,胡德均,邢克宣,等.深基础逆作法支撑柱的设置及节点的技术处理.施工技术,2002;31(1):28—30Shi Guangde,Hu Dejun,Xing Kexuan,et al.Placement of support column and technical treatment of toint in deep foundation ditch reverse construction method.Construction Technology,2002;31(1):8 —30
    10 李国锋,丁文其,李志厚,等.特殊地质公路隧道动态设计施工技术.北京:人民交通出版社,2005:19—105Li Guofeng,Ding Wenqi,Li Zhihou,et al.Dynamic design and construction technology of special geological highway and tunnel.Beijing:China Communications Press,2005:19—105
    11 赵永贵,蒋辉,赵晓鹏.TSP203超前预报技术的缺陷与TST技术的应用.工程地球物理学报,2008;5(3):266—273Zhao Yonggui,Jiang Hui,Zhao Xiaopeng.The technical bug of TSP203 and application of TST technique.Chinese Journal of Engineering Geophysics,2008;5(3):266—273
    12 刘志刚,刘秀峰.TSP(隧道地震勘探)在隧道隧洞超前预报中的应用与发展.岩石力学与工程学报,200;22(8):1399—1402Liu Zhigang,Liu Xiufeng.TSP application and development in tunnel lead forecast.Chinese Journal of Rock Mechanics and Engineering,2003;22(8):1399—1402

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心