深水高桩承台基础地震动水效应数值解析混合算法
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
针对桥梁深水高桩承台基础—水体耦合动力问题,首先建立了深水高桩承台基础简化数值分析模型,针对桩身,给出了基于水下桩基尺度的桩身动水附加质量解析算法,并计入群桩效应的影响;针对承台,提出了动水附加质量简化有限元计算方法,依靠基于势流体单元的合理的流体动力学数值表达,即考虑了承台真实几何尺寸,又兼顾了其振动周期对承台动水效应的影响,从而得到了地震作用下高桩承台基础地震动水效应数值解析混合算法.以四桩高桩承台试验模型为研究对象,利用该方法进行模态及时程分析,通过与试验及其他数值、解析结果比较,表明本算法与试验及完全数值方法吻合良好,其计算精度与计算效率得到有效改善.该研究对深水高桩承台基础的抗震分析和设计具有参考价值.
This paper focuses on the dynamic analyses of the deep-water elevated pile foundation in contact with water.A simplified analysis model of the pile foundation considering the hydrodynamic effect is proposed firstly.The numerical-analytical mixed method for earthquake induced hydrodynamic added mass is provided as follows: for piles,an analytical solution based on the scale of the underwater pile is given including the effect of pile group;for cap,a simple finite element method based on the potential-based fluid formulation is developed considering the geometry and vibration periods of the cap.The proposed mixed method is applied to a 4-pile experimental specimen for the modal and time history analyses.The results agree well with the experimental data in comparison with the finite element solutions and other analytical solution in the literature.The method improves the calculation accuracy and efficiency and is a valuable reference for the seismic analysis and design of the deep-water elevated pile cap foundation.
引文
[1]尚久铨,杨连第,单文秀.导管架式海洋平台模型的静态试验与计算[J].振动与冲击,1990,9(1):22.SHANG Jiuquan,YANG Liandi,SHAN Wenxiu.Staticexperiments and analyses of the tube supported offshoreplatform model[J].Journal of Vibration and Shock,1990,9(1):22.
    [2]魏凯,伍勇吉,袁万城,等.桥梁群桩基础—水耦合系统动力特性数值模拟[J].工程力学,2010,28(增刊I):195.WEI Kai,WU Yongji,YUAN Wancheng,et al.Numericaldynamic analysis for water pile group bridge foundationinteracted system[J].Engineering Mechanics,2010,28(Supplement I):195.
    [3]Bittner R B,Gerwick B C,Zhang X.Design and construction ofthe Sutong bridge foundations[J].Journal of DeepFoundations Institude,2007,1(1):2.
    [4]Liu S X,Li Y C,Li G W.Wave current forces on the pile groupof base foundation for the east sea bridge,China[J].Journal ofHydrodynamics,Ser B,2007,19(6):661.
    [5]Westergaard H M.Water pressures on dams during earthquakes[J].ASCE Transactions,1933,98:418.
    [6]Morison J R,O’Brien M P,Johnson J W,et al.The forceexerted by surface waves on piles[J].Petroleum Transactions,AIME,1950,189:149.
    [7]赖伟.地震和波浪作用下深水桥梁的动力响应研究[D].上海:同济大学土木工程学院,2004.LAI Wei.Dynamic interaction between deep-water bridges andwater during earthquakes and wave[D].Shanghai:College ofCivil Engineering of Tongji University,2004.
    [8]刘振宇,李乔,赵灿晖,等.深水矩形空心桥墩在地震作用下附加动水压力分析[J].振动与冲击,2008,27(2):53.LIU Zhenyu,LI Qiao,ZHAO Canhui,et al.Study of theearthquake induced added hydrodynamic pressure on the deep-water hollow rectangular piers[J].Journal of Vibration andShock,2008,27(2):53.
    [9]黄信,李忠献.动水压力作用对深水桥墩地震响应的影响[J].土木工程学报,2011,44(1):65.HUANG Xin,LI Zhongxian.Influence of hydrodynamic pressureon seismic response of bridge piers in deep water[J].ChinaCivil Engineering Journal,2011,44(1):65.
    [10]宋波,李悦.高桩承台动水力简便计算方法[J].北京科技大学学报,2011,33(4):509.SONG Bo,LI Yue.Simplified calculation method ofhydrodynamic force for elevated pile caps[J].Journal ofUniversity of Science and Technology Beijing,2011,33(4):509.
    [11]Gao Y,Yuan W C,Jin X G.Soil-structure-water interaction of acable-stayed bridge under seismic excitation[C/CD]//The 14thWorld Conference on Earthquake Engineering.Beijing:[s.n],2008.
    [12]Bhatta D D,Rahman M.On scattering and radiation problemfor a cylinder in water of finite depth[J].International Journalof Engineering Science,2003,41(9):931.
    [13]Miquel B,Bouaanani N.Practical dynamic analysis of structureslaterally vibrating in contact with water[J].Computers&Structures,2011,89(23-24):2195.
    [14]Liaw C Y,Chopra A K.Dynamics of towers surrounded by water[J].Earthquake Engineering&Structural Dynamics,1974,3(1):33.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心