大跨度斜拉桥地震反应时程分析
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
大跨度斜拉桥一般都是交通运输的枢纽工程,对斜拉桥进行正确有效的抗震设计有着非常重要的意义。通过有限元建模对大跨度斜拉桥进行动力特性分析;运用时程分析方法,选取EI-Centro波对该桥进行了地震反应分析,分析了大跨度斜拉桥在不同地震动作用下的反应特点。分析结果表明,对于长柔性体系的斜拉桥,不能忽略竖向地震反应,应对竖向地震反应做必要的研究。
Large-span cable-stayed bridge is a transportation hub project,therefore,the seismic design of cable-stayed bridges are valid,has some very important implications.This article by finite element modeling for dynamic characteristic analysis of long-span cable-stayed bridges;using time history analysis method,select EI-Centro waves on the bridge for earthquake response analysis,analysis of long-span cable-stayed bridges under different seismic response characteristics.Analysis results show that long flexible systems for cable-stayed bridges,vertical seismic response must not be ignored,vertical seismic response of doing the necessary research.
引文
[1]杨玉民,袁万城,范立础.大跨斜拉桥横向地震反应及其分形特征[J].同济大学学报,2001,2(1):15-19.
    [2]何度心.桥梁抗震计算[M].北京:地震出版社,1991:68-98.
    [3]周建春,刘光栋.大跨度公路桥梁抗震分析研究[J].桥梁建设,1998,(1):5-9.
    [4]赵雷,武芳文.南京长江三桥初步方案施工阶段稳定性分析[J].西南交通大学学报,2005,(4):467-473.
    [5]曹永睿,钟铁毅,顾正伟,唐兴国.大跨度斜拉桥地震响应分析[J].铁道建筑,2007,(5):23-27.
    [6]司徒文林,徐凯燕,陈丹丹.大跨度斜拉桥多点激励地震反应分析[J].交通科技,2009,(6):13-15.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心