北江大堤石角段若干地质问题初步分析
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
通过对北江大堤石角段区域地质及堤基水文地质问题的初步分析,认为堤基防渗目标为砂砾层。鉴于堤后渗透破坏大多表现为堤后超高承压水头的破坏,因此主动拦截强渗透层,减少河水对堤基的快速、大量补给,同时大大削弱堤前后的水力联系,仍应作为本堤段的主要防渗措施。建议通过完善高喷设计,解决深理卵砾石防渗问题。
Based on preliminary analysis of geologic and hydrogeologic conditions it is conluded the sand and gravel bed is the object ofseepage treatment for levee foundation. Since the damage behind the levee is mainly caused by ultra-high artesian pressure behind thelevee, the major seepage control measure is to intercept the strongly pervious bed so as to reduce the replenishment of water to levee foundation and weaken the hydraulic link before and behind the levee.The autbor suggests the design of high-pressure giout jetting beirnproved for the seepage treatment of deep-buried Sand and gravel.
引文
[1]任天培,等.水文地质学[M].北京:地质出版社,1986.
    [2]钱家欢,等.土工原理与计算(上册)[M].北京:水利电力出版社, 1979.
    [3]白永年,等.土石坝加固[M].北京:水利电力出版社,1991.
    [4]陈长东,查振衡,等。高压喷射注浆防渗墙施工技术的应用.人民珠江,1999(2).
    ①广东省地展科技咨询中心.飞来缺水利枢纽工程地震基本烈度综合研究报告,1987.
    ②徐起浩等.三水市南边镇4.2级地震观场调查报告,1997.
    ③广东省水利电力勘测设计研究院,五角堤段工程地质专题报告,1997年.
    ④广东省地质局.1/200000林集幅,从化相地质图,1969年.
    ⑤刘炳常.北江大堤高喷段(摆喷),钻孔地质纵剖面图绘制说明,1998年.
    ⑥曹洪,羽海英,张挺.北江大堤五角段渗流监测资料分析及有限元数值计算,1998年.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心