十三陵抽水蓄能电站上池位于蟒山山顶,不仅蓄水发电,而且作为"天池"为十三陵游览区增加了又一新的景色供游人观赏。本文以十三陵抽水蓄能电站上池西北坡塌滑体锚索锚固为例,系统论述了预应力锚索在地质灾害防治中的应用。
The upper reservoir of Shisanling pumped storage power station is located at the top of Mangshan Mountain.It is used not only for sluice and electricity generating,but also a new sight sport as "sky pond" in Shisanling recreation area.Taking the anchoring of northwestern collapsebody at the upper reservoir of Shisanling pumped storage power station as an example,this paper systematically elaborate the application of prestressing anchored cable in of the prevention of geologic hazard.
引文
①胡海涛 ,等。十三陵抽水蓄能电站施工期中工程地质问题的咨询报告。
①柳州市建筑机械总厂 ,YCW型系列千斤顶使用说明书。
[1] 黄晓华,黄世明.京珠高速公路粤境南十六标高边坡治理工程实践[J].中国地质灾害与防治学报,2002,13(1):53~56.
[2] 聂志红,方理刚,李亮,等.滑坡整治工程中预应力锚索锚固段应力测试与分析[J].岩土工程界,2002,5(5).
[3] 丁多文,白世伟,刘泉声.预应力长锚索锚固深度模型试验研究,工程勘察,1995,(4):14~17.
[4] 程良奎,等.岩土加固实用技术[M].地震出版社,1994.