摘要
主要介绍了2500m3高炉移地大修工程中,送风装置耐火内衬施工的技术攻关具体实施情况。通过精心准备和统筹安排,获得非常理想的效果,取得较大的经济效益。
The paper describes the technique of building refractory lining of sending-wind device in the 2# 2500 m3 BF constrcation. Though aborative preparation and arrangement, gain the ideal effect, obtain the bigger econonic performance.