轻型厂房的几种基础型式经济性比较
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
针对上部结构荷载不大,场地内回填土较厚且回填时间较长的某一轻型厂房,笔者选择人工挖孔桩,冲击式夯扩桩和换土垫层三种不同的基础施工方案进行比较,在保证强度、刚度、稳定性和严格控制基础沉降的前提下,从不同的角度作出工程技术经济分析,对类似工程具有一定的参考作用.
A light-duty factory building was studied,which was characterized by the light burden of supper structure,the heavy backful soil and the long-time backfilling.Three basis construction plans were compared,that is,man-made digging pile,shock rammed-soil pile and replacement method.On the basis of ensuring its strength,rigidity,stability and strictly controlling the basis settling,the economy of the project technology was analyzed from different aspects,which produced reference for those similarities.
引文
[1]彭安宁.考虑地基实际变形特征的基础实际分析方法[J],建筑结构学报,1992,13(3):115~117.
    [2]秦四清.深基坑工程优化设计[M].北京:地震出版社,1998.
    [3]沈杰.地基基础设计手册[M].上海:上海科学技术出版社,1998.
    [4]林天健.桩基础设计指南[M].北京:中国建筑工业出版社,1999.
    [5]《桩基工程手册》编写委员会.桩基工程手册[M].北京:中国建筑工业出版社,1995.