碱坪沟地震次生泥石流形成特征与发展趋势
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
"5.12"汶川地震后,龙溪河碱坪沟流域内堆积了大量的松散固体物质,成为参与泥石流形成的主要物源。碱坪沟于2009—2010年先后3次暴发大规模泥石流灾害。通过对碱坪沟的地形、水源和物源条件的分析发现,该流域地形和水源条件满足泥石流形成的条件,且在地震前后未发生显著变化,而物源条件已经成为影响该区域泥石流形成与发展的主要因素。基于流域物源量与物源固结效应的研究结果表明,在5a内碱坪沟泥石流灾害较活跃,可能暴发大规模泥石流灾害。5~10a后,在降雨条件不发生较大变化以及不暴发大地震的情况下,流域内泥石流规模和频率会逐渐减小,只有在低频率暴雨作用下才可能暴发大规模泥石流灾害。
After the "5·12" Wenchuan Earthquake,plenty of loose soil materials accumulated in Jianping Basin of Longxi River,which is the main source material for debris flows initiation.Three large-scale debris flows occurred in Jianping Gully in 2009 and 2010.In contrast with the pro-earthquake conditions,the terrain and rainfall have not changed a lot and are appropriate for the initiation of debris flow,so loose materials can be regarded as the most significant impact factor for the debris flow characteristics and its development trend.The results based on the analysis of loose materials and its consolidation impact shows that debris flows in Jianping Gully will occur frequently in 5 years.The possibility of catastrophic debris flow will be high.In the next 5~10 years,the frequency and scale of debris flows in Jianping Gully will decline if there is no significant change for the rainfall and no strong earthquake,while large-scale debris flows can also occur under extremely rainfall with low frequency.
引文
[1]许强.四川省“8.13”特大泥石流灾害特点、成因与启示[J].工程地质学报,2010,18(5):596-608.
    [2]Benda L,Cundy T.Predicting deposition of debris flowsin mountain channels[J].Canadian Geotechnical Jour-nal,1990,27:409-417.
    [3]Auer K,Shakoor A.A statistical approach to evaluatedebris avalanche activity in central Virginia[J].Engi-neering Geology,1993,33:305-321.
    [4]Cheng K Y,Lin L K,Chang S Y.The filed investiga-tion and GIS application in a potential hazardous area ofdebris flow[C]∥Debris-Flow Hazards Mitigation:Me-chanics,Prediction,and Assessment.New York:Pro-ceedings of the First International Conference.ASCE,1997:83-92.
    [5]Nakagawa H,Takahashi T.Estimation of a debris-flowhydrograph and hazard area[C]∥Debris-Flow HazardsMitigation:Mechanics,Prediction,and Assessment.New York:Proceedings of First International Confer-ence.ASCE,1997:64-73.
    [6]Lin P S,Feng T Y,Lee C M.A study on the initiationcharacteristics of debris flow in gravelly deposits[J].Journal of Chinese Soil and Water Conservation,1993,24(1):55-64.
    [7]Lin P S,Lin J Y,Hung J C,et al.Assessing debris-flow hazard in a watershed in Taiwan[J].EngineeringGeology,2002,66:295-313.
    [8]Di B F,Chen N S,Cui P,et al.GIS-based risk analysisof debris flow:An application in Sichuan,southwestChina[J].International Journal of Sediment Research,2008,23:138-148.
    [9]唐川.基于GIS技术对云南省泥石流的风险评估[J].地理科学,2002,22(3):300-304.
    [10]Melelli L,Taramelli A.An example of debris-flowshazard modeling using GIS[J].Natural Hazards andEarth System Sciences,2004,4:347-358.
    [11]Wang C X,Esaki T,Xie M W,et al.Landslide anddebris-flow hazard analysis and prediction using GIS inMinamata-Hougawachi area,Japan[J].Environ.Geol.,2006,51:91-102.
    [12]Han Y S,Liu H J,Zhong D L,et al.GIS-based riskassessment of debris flow disasters in the upper reachof Yangtze River[J].Wuhan University Journal ofNatural Sciences,2007,12(4):657-662.
    [13]Di B F,Zeng H J,Zhang M H,et al.Quantifying thespatial distribution of soil mass wasting processes afterthe 2008earthquake in Wenchuan,China:A casestudy of the Longmenshan area[J].Remote Sensing ofEnvironment,2010,114:761-771.
    [14]范建蓉,田兵伟,程根伟,等.基于多源遥感数据的“5.12”汶川地震诱发堰塞体信息提取[J].山地学报,2008,26:257-262.
    [15]王文杰,潘英姿,徐卫华,等.四川汶川地震对生态系统破坏及其生态影响分析[J].环境科学研究,2008,21:110-116.
    [16]陈晓清,崔鹏,程尊兰,等.“5.12”汶川地震堰塞湖危险性应急评估[J].地学前缘,2008,15:244-249.
    [17]童立强.“5.12”汶川大地震极重灾区地震堰塞湖应急遥感调查[J].国土资源遥感,2008,3:71-64.
    [18]崔鹏,韦方强,何思明,等.“5.12”汶川地震诱发的山地灾害及减灾措施[J].山地学报,2008,26(3):280-282.
    [19]中国科学院成都山地灾害与环境研究所.泥石流研究与防治[M].四川成都:四川科学技术出版社,1989.
    [20]周必凡,李德基,罗德富,等.泥石流防治指南[M].北京:科学出版社,1991.
    [21]国家防汛抗旱总指挥部办公室,中国科学院水利部成都山地灾害与环境研究所.山洪泥石流滑坡灾害及防治[M].北京:科学出版社,1994.
    [22]Chen N S,Yang C L,Zhou W,et al.The critical rain-fall characteristics for torrents and debris flows in theWenchuan earthquake stricken area[J].Journal ofMountain Science,2009,6(4):362-372.
    [23]四川省水利水电厅.四川省中小流域暴雨洪水计算手册[M].四川成都:四川省水利水电厅,1984.
    [24]陈宁生,第宝锋,李战鲁,等.“5.12”汶川地震龙门山风景区地震次生山地灾害特征与处理建议[J].山地学报,2008,26(3):272-275.
    [25]Guzzetti F,Ardizzone F,Cardinali M,et al.Landslidevolumes and landslide mobilization rates in Umbria,central Italy[J].Earth and Planetary Science Letters,2009,279:222-229.
    [26]唐邦兴等.中国泥石流[M].北京:商务印书馆,2000.
    [27]康志成,李焯芬,马蔼乃,等.中国泥石流研究[M].北京:科学出版社,2004.
    [28]陈宁生,黄蓉,李欢,等.汶川“5.12”地震次生泥石流沟应急判识方法与指标[J].山地学报,2009,27(1):108-114.
    [29]陈宁生,陈清波.有限物源流域不同规模的泥石流频率分析[J].成都理工大学学报:自然科学版,2003,30(6):612-616.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心