摘要
通过采用“宽孔距布孔、不耦合装药”的控制爆破方法部分拆除某车间内一设备砼基础,介绍了车间内设备砼基础部分拆除的爆破方案、孔网参数、爆破网路、安全防护措施。
The concrete foundation of the devices in workshop was demolished by adopting the controlled blasting with "wide hole distance pattern and uncoupling powder charge",the blasting program,hole-net parameters,blasting network,safe protection measures are introduced while partially dismantling the concrete foundation of the devices in workshop.