引文
[1]国家电监会.国家处置电网大面积停电事件应急预案[Z].2006.
[2]国家电监会.关于进一步加强电力应急管理工作的意见[Z].2006.
[3]国家电网公司.国家电网公司处置电网大面积停电事件应急预案[Z].2005.
[4]印永华,郭剑波,赵建军,等.美加“8.14”大停电事故初步分析以及应吸取的教训[J].电网技术,2003,27(11):8-11.Yin Yonghua,Guo Jianbo,Zhao Jianjun,et al.Preliminary analysisof large scale blackout in interconnected North America power gridon August 14 and lessons to be drawn[J].Power System Technology,2003,27(11):8-11(in Chinese).
[5]周孝信,郑健超,沈国荣,等.从美加东北部电网大面积停电事故中吸取教训[J].电网技术,2003,27(9):T1.Zhou Xiaoxin,Zheng Jianchao,Shen Guorong,et al.Draw lessonsfrom large scope blackout of interconnected North America powergrid[J].Power System Technology,2003,27(9):T1(in Chinese).
[6]胡学浩.美加联合电网大面积停电事故的反思和启示[J].电网技术,2003,27(9):2-6.Hu Xuehao.Rethinking and enlightenment of large scope blackout ininterconnected North America power grid[J].2003,27(9):2-6(in Chinese).
[7]赵希正.强化电网安全保障可靠供电—美加“8.14”大停电事件给我们的启示[J].电网技术,2003,27(10):1-7.Zhao Xizheng.Strength power system security to ensure reliabledelivery[J].Power System Technology,2003,27(10):1-7(in Chinese).
[8]雷晓蒙.1996年美国西部电网两次大面积停电事故分析[J].电力安全技术,1997,36(4):31-36.Lei Xiaomeng.Analysis of large scale blackout of WSCC of Americain 1996[J].Electric Safety Technology,1997,36(4):31-36(in Chinese).
[9]阮前途,王伟,张征.欧洲“11.4”大面积停电事故的教训和启示[J].华东电力,2007,35(1):5-8.Ruan Qiantu,Wang Wei,Zhang Zheng.Lessons learned from“11.4”blackouts in Europe[J].East China Electric Power,2007,35(1):5-8(in Chinese).
[10]郭永基.加强电力系统可靠性的研究和应用——北美东部大停电的思考[J].电力系统自动化,2003,27(19):1-5.Guo Yongji.To Focus on improving power system reliability,apondering over the East North-America Major Blackout[J].Automation of Electric Power Systems,2003,27(19):1-5(in Chinese).
[11]唐斯庆,张弥,李建设.海南电网“9.26”大面积停电事故的分析与总结[J].电力系统自动化,2006,30(1):1-7.Tang Siqing,Zhang Mi,Li Jianshe.Review of blackout in Hainan on September 26th—cause and recommendations[J].Automation of Electric Power Systems,2006,30(1):1-7.
[12]Markrov Y V,Hardiman R C.Risk,reliability and restructuring[C].IEEE Summer Meeting,Denver,Colorado,USA,2004.
[13]Gomes P.New strategies to improve bulk power system security:lessons learned from large blackout[C].IEEE Summer Meeting,Denver,Colorado,USA,2004.
[14]Watts D.Security & vulnerability in electric power system[C].NAPS2003,North American Power System symposium,Missouri,2003:559-566.
[15]Lubkeman D,Julian D E.Large scale storm outage management[C].IEEE Summer Meeting,Denver,Colorado,USA,2004.
[16]Laverty E,Schulz N N.An improved algorithm to aid in post-heatstorm restoration[J].IEEE Trans on Power Systems,1999,14(2):446-451.
[17]谢强,李杰.电力系统自然灾害的现状及对策[J].自然灾害学报,2006,15(4):126-131.Xie Qiang,Li Jie.Current situation of natural disaster in electricpower system and countermeasures[J].Journal of Natural Disasters,2006,15(4):126-131(in Chinese).
[18]谢强,张勇,李杰.华东电网500 k V任上线5237线飑线风致倒塔事故调查分析[J].电网技术,2006,30(10):60-63.Xie Qiang,Zhang yong,Li Jie.Investigation on tower collapses of500k V Renshang 5237 transmission line caused by down burst[J].Power System Technology,2006,30(10):60-63(in Chinese).
[19]胡敏.输电线路大范围冰灾事故分析及对策[J].高电压技术,2005,31(4):14-15.Hu Min.Analysis and countermeasures for large area accident causeby icing on transmission line[J].High Voltage Engineering,2005,31(4):14-15(in Chinese).
[20]刘长根,肖江划,曹刚强.湖南电网50年一遇冰灾的特征、成因及应对措施[J].电力建设,2005,26(7):1-3,21.Liu Changgen,Xiao Jianghua,Cao Gangqiang.Characteristic,causeand countermeasures for disaster once for 50 years in Hunan powergrid[J].Electric Power Construction,2005,26(7):1-3,21(in Chinese).
[21]柳春光,李秀菊.电力供应系统功能失效分析[J].世界地震工程,2002,18(3):19-23.Liu Chunguang,Li Xiuju.Seismic function assessment on powersupply system[J].World Earthquake Engineering,2002,18(3):19-23(in Chinese).
[22]邹其嘉,孙振凯,毛国敏.电力系统地震易损性研究[J].自然灾害学报,1994,3(2):82-90.Zou Qijia,Sun Zhenkai,Mao Guomin.Research on the seismicvulnerabilities of electric system[J].Journal of Natural Disaster,1994,3(2):82-90(in Chinese).
[23]史培军.三论灾害研究的理论与方法[J].自然灾害学报,2002,11(3):1-9.Shi Peijun.Theory on disaster science and disaster dynamics[J].Journal of Natural Disaster,2002,11(3):1-9(in Chinese).
[24]张继权,冈田宪夫,多多纳裕一.综合自然灾害风险管理[J].自然灾害学报,2006,15(1):29-37.Zhang Jiquan,OKADA Norio,TATANO Hirokazu.Integrated naturaldisaster risk management:comprehensive and integrated model and Chinese strategy choice[J].Journal of Natural Disasters,2006,15(1):29-37(in Chinese).
[25]张荣乾,谭忠富,王成文,等.供电企业风险指标体系及多级评估模型[J].电力学报,2006,21(2):123-127,146.Zhang Rongqian,Tan Zhongfu,Wang Chengwen,et al.The riskmodel for power supply companies[J].Journal of Electric Power,2006,21(2):123-127,146(in Chinese).
[26]牛建伟.电力体制改革中的电网公司风险管理[J].现代电力,2004,21(3):97-101.Niu Jianwei.Risk management system for power grid enterprises inthe innovation[J].Modern Electric Power,2004,21(3):97-101(in Chinese).
[27]周家启,赵霞.电力系统风险评估方法和应用实例研究[J].中国电力,2006,39(8):77-81.Zhou Jiaqi,Zhao Xia.Models and methods applied to risk assessmentof power systems[J].Electric Power,2006,39(8):77-81(in Chinese).
[28]冯永清,张伯明.基于可信性理论的电力系统运行风险评估(一)运行风险的提出与发展[J].电力系统自动化,2006,30(1):17-23.Feng Yongqing,Zhang Boming.Power system operation riskassessment based on credibility theory part one:propound anddevelopment of operation risk assessment[J].Automation of Electric Power Systems,2006,30(1):17-23(in Chinese).