武山铜矿中深孔爆破振动速度衰减规律的研究
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
以校企合作项目"采矿工艺优化试验研究"为依托,通过现场测试,收集大量测试数据和波形信号,并对测试数据运用最小二乘法进行回归分析,得出武山铜矿中深孔爆破振动速度的衰减规律,为该矿山今后确定最大一段起爆药量提供了有力的依据和保障,同时也可为类似地下矿山的设计和施工提供参考。
Based on the support of a program jointly carried out by our university and an enterprise,"Experiment and Research on Optimization of Mining Technology",a lot of measured data and vibration wave signals from field blasting tests are collected and regression on the measured data is carried out by using the least square method.The attenuation law of vibration velocities from blasting with medium-length holes is gotten in Wushan Copper Mine.This will provide powerful basis and safeguard for determining the maximum charge weight per delay interval in this mine.Also,this can provide a reference for the design and implementation of blasting in similar underground mines.
引文
[1]吴贤振,李印洪,焦永斌.永平铜矿94m水平中深孔台阶爆破及其地震效应研究[J].有色金属,2005(7):29-31.
    [2]朱红旗,刘军,张金龙.中深孔爆破在地下采空区处理中的应用[J].采矿技术,2006(1):71-72.
    [3]张雪亮,黄树棠.爆破地震效应[M].北京:地震出版社,1981.
    [4]上海师范大学数学系.回归分析及试验设计[M].上海:上海科学技术出版社,1978.
    [5]毕卫国,石崇.爆破振动速度衰减公式的优化选择[J].岩土力学,2004(1):99-102.
    [6]GB6722-2003爆破安全规程[S]//中华人民共和国国家质量监督检验疫总局.北京:中国标准出版社,2003.