摘要
根据某铜钼矿KT2号矿体的空间形态及赋存条件,充分考虑采场顶板保护、地压管理,保护矿山环境,高效回收资源,降低生产成本等因素,采用垂直分条上向水平分层胶结充填采矿法,有较好的经济效益,且安全性能得到保障。
According to the spatial form and existing conditions of KT2 orebody in a copper-molybdenum mine, the factors such as stope roof protection, ground pressure management, mine environment protection, high-efficient recovery of resources, and reduction of production cost are fully considered The mining method of vertical slicing upward horizontal slicing cemented backfill has better economic benefit and the safety is guaranteed.
引文
[1]田昌进,何茂才,孙德民.上向水平分层胶结充填采矿法在某矿山的应用[J].有色冶金设计与研究,2011,32(1).
[2]梅社华.香格里拉铜厂沟铜钼矿开采方案优化[J].有色金属:矿山部分,2014(3):16-18.