川藏铁路全断面掘进机穿越断层破碎带隧道施工研究
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:Research on tunnel boring machine construction of fault fracture zone in Sichuan-Tibet railway tunnel
  • 作者:刘卓
  • 英文作者:LIU Zhuo;Equipment and Materials Department,China Railway 18th Engineering Bureau Group Co.,Ltd.;
  • 关键词:隧道 ; 全断面掘进机(TBM) ; 断层 ; 破碎带 ; 川藏铁路
  • 英文关键词:tunnel;;tunnel boring machine(TBM);;fault;;crushed zone;;Sichuan-Tibet railway
  • 中文刊名:中国工程机械学报
  • 英文刊名:Chinese Journal of Construction Machinery
  • 机构:中铁十八局集团有限公司设备物资部;
  • 出版日期:2019-06-15
  • 出版单位:中国工程机械学报
  • 年:2019
  • 期:03
  • 语种:中文;
  • 页:79-83
  • 页数:5
  • CN:31-1926/TH
  • ISSN:1672-5581
  • 分类号:U455.4
摘要
通过大断层破碎带是全断面掘进机(TBM)施工的难点.基于引汉济渭工程秦岭隧洞岭北TBM穿越断层破碎带的施工工艺和研究成果,提出了TBM穿越断层破碎带的施工工法.利用激发极化法与三维地震法进行超前地质预报,施工纵向小导洞和横向导洞、管棚,利用多点位移计、光纤光栅应变计监测围岩应力和变形,解决了刀盘卡转和防止隧道塌方.该施工工法可提高TBM适应不同地质条件的能力,优化TBM的施工组织设计,为川藏铁路长大隧道的施工提供借鉴.
        The large fault fracture zone is a key point in the construction process of full face tunnel boring machine(TBM).In this paper,the construction method and research results of the TBM crossing the Sichuan-Tibet railway fault-fracture zone are proposed by referring to the construction technology and research results of the TBM crossing fault fracture zone of Qinling Tunnel.The induced polarization method and the 3 D seismic method are effectively utilized for advanced geological prediction.Longitudinal small guide holes and lateral guide holes and pipe sheds are constructed.And the multi-point displacement meter and fiber grating gage meter are effectively utilized to monitor the surrounding rock stress and deformation.It solves the problem of cutter disc rotation and preventing tunnel collapse,which is beneficial to optimize the construction organization design of TBM and improve the ability of TBM to adapt to different geological conditions,and provide reference for the construction of the Sichuan-Tibet railway long tunnel.
引文
[1] 杜彦良,杜立杰.全断面岩石隧道掘进机:系统原理与集成设计[M].武汉:华中科技大学出版社,2011.DU Y L,DU L J.Full-section rock tunnel boring machine:system principle and integrated design[M].Wuhan:Huazhong University of Science and Technology Press,2011.
    [2] MARTIN D.全断面隧道掘进机在不良和劣质岩层中开挖隧道[J].隧道译丛,1989(6):24-31.MARTIN D.Full-sectiontunnel boring machine excavates tunnels in poor and inferior rock formations[J].Tunnel Translation Series,1989(6):24-31
    [3] 唐经世.隧道与地下工程机械:掘进机[M].北京:中国铁道出版社,1988:133.TANG J S.Tunnel and underground construction machinery:tunneling machine[M].Beijing:China Railway Publishing House,1988:133.
    [4] 刘春.秦岭隧道Ⅰ线(北口)使用TBM施工初探[J].铁道工程学报,1998(增刊1):18-23.LIU C.Study on the construction of TBM in the Line I (north exit) of Qinling tunnel[J].Journal of Railway Engineering Society,1998(Suppl.1):18-23.
    [5] 薛永庆.引汉济渭工程TBM卡机脱困技术[J].铁道建筑技术,2017(8):106-110.XUE Y Q.Techniques for removing trapped TBM machine in Hanjiang to Weihe River project[J].Railway Construction Technology,2017(8):106-110.
    [6] 王新.引汉济渭输水隧洞TBM卡机处理方案研究[J].陕西水利,2017(3):155-158.WANG X.Study on the treatment plan of stuck TBM machine for the Hanjiang to Weihe River water conveyance tunnel[J].Shaanxi Water Conservancy,2017(3):155-158.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700