摘要
总结了某造纸厂扩建空压站压缩空气系统及冷却水系统的设计。具体包括压缩空气系统设计、压缩机及配套过滤干燥装置等的选择、压缩空气管道设计;以及冷却水系统设计、冷却塔和冷却水泵的选择、储水箱设计以及冷却水管道的设计。
The paper introduces the design of an expanded compressed air system and cooling water system of an air compressing station in a paper-making plant, including the design of compressed air system, selection of compressor and its filter drying device, design of compressed air pipeline as well as the design of cooling water system, selection of cooling tower and cooling water pumps and the design of water storage tank and cooling water pipeline.