摘要
为更好地解决建筑结构构件拆分不合理、PC(混凝土预制件)构件连接处钢筋碰撞、PC构件内部钢筋预埋件错位及PC构件施工过程中管理难度加大等问题,通过利用BIM(建筑信息模型)技术,优化PC构件拆分方案、在PC构件深化设计过程中检测钢筋预埋件之间的碰撞、结合进度计划实现4D虚拟施工模拟。实践表明:BIM技术应用于PC构件设计,可以提高装配式混凝土结构的生产和施工效率。
BIM technology can be introduced to solve the problems such as the irrational split of building structural members, the collisions of the steel bars between precast-concrete members, the dislocation of steel bars and embedded parts inside precast-concrete members and the increase of difficulty in the construction management of precast-concrete members. The utilization of BIM technology will optimize precast-concrete members split scheme, detect collision between steel bars and embedded parts during the process of detail design, and implement 4 D virtual construction simulation combined with schedule plan. Practice shows that the application of BIM in the design of precast-concrete members can improve the production and construction efficiency of precast-concrete structures.
引文
[1] 国务院办公厅.国务院办公厅关于大力发展装配式建筑的指导意见[EB/OL].(2016-09-30) [2018-02-15].http://www.gov.cn/zhengce/content/2016-09/30/content_5114118.htm.
[2] 王陈远.基于BIM的深化设计管理研究[J].工程管理学报,2012,26(4):12.
[3] 李坤.BIM技术在地铁车站结构设计中的应用研究[J].铁道工程学报,2015,32(2):103.
[4] 蒋剑.BIM在预制装配式建筑PC住宅设计中的应用[J].上海建设科技,2014(5):21.
[5] 陈力,金星,王荣标,等.叠合板式混凝土剪力墙结构工程施工问题及对策研究[J].施工技术,2015,44(16):57.
[6] 马跃强,施宝贵,武玉琼.BIM技术在预制装配式建筑施工中的应用研究[J].上海建设科技,2016(4):45.
[7] 王军强.新型装配整体式混凝土结构施工技术[J].四川建筑科学研究,2015,41(1):31.
[8] 田东,李新伟,马涛.基于BIM的装配式混凝土建筑构件系统设计分析与研究[J].建筑结构,2016,46(17):58.
[9] 王爱兰,宋萍萍,杨震卿,等.BIM技术在装配式混凝土结构工程中的应用[J].建筑技术,2015,46(3):228.
[10] 杨元锐,杨天宇.BIM技术在装配式住宅项目中的应用[J].施工技术,2018,47(5):137.
[11] 王雪青,张康照,谢银.基于BIM实时施工模型的4D模拟[J].广西大学学报(自然科学版),2012,37(4):814.
[12] 龙腾,唐红,吴念,等.BIM技术在武汉某高架桥工程施工中的应用研究[J].施工技术,2014,43(3):80.