用户名: 密码: 验证码:
多模式下水泥流通加工中心选址研究
详细信息    本馆镜像全文|  推荐本文 |  |   获取CNKI官网全文
摘要
经济的快速增长,拉动水泥需求量的增加,各水泥企业纷纷扩大生产规模、建设新的水泥企业,出现了选址混乱无序竞争的现象。本文基于区位理论,提出建设水泥流通加工中心,将水泥产品生产的连续过程离散为熟料生产和成品水泥生产两部分的思路,并对实际情况中多模式下水泥流通加工中心的选址进行系统研究。
     单水泥流通加工中心选址,首先运用运输规划模型量化水泥物流费用、熟料物流费用和混合材物流费用,进行初步选址,然后运用MDHGF集成模型,对选址初步方案进行综合比选确定最终方案。多水泥流通加工中心选址,以流通加工中心建设投资与物流费用最小为目标函数,以水泥产量、混合材供应量、水泥需求量为变量,建立了混合整数规划模型,并给出贪婪取走算法。论文应用上述模型阐述了多人合作建设多水泥流通加工中心选址的必然性,并采用Shapley值对该选址分担的物流费用进行了公平的分配。
     论文将各选址模型应用于东北局部区域进行验证,结论符合某大型水泥企业战略发展规划以及国家产业政策,为企业进行水泥流通加工中心选址与合作选址提供了科学合理的决策依据。
Owing to the specific characters of concrete production, much more attention should be paid to the concrete factories positioning. By construction of cement circulating processing center, the paper divides the continuous concrete production process into two segments: cement clinker production and concrete production. Cement clinker production is at the mine and the concrete production is in the circulating processing center. The construction site of cement clinker production is mainly determined by the sources of raw materials, while the positioning of concrete circulating processing center is influenced by multi-factors and needs scientific and reasonable decisions, for it directly determines the logistics performance.
     Since the concrete possesses such traits as heavy weight, big volume and low value, the proportion of logistics cost is high in the concrete cost, from 30% up to 50% or even higher. Reasonably and scientifically choosing the position of concrete circulating processing center, we can make reasonable choice on transportation method, to avoid indirect transportation and convection transportation, to reduce invalidation transportation and to deduct logistics cost efficiently. Based on the enterprise's behave, the paper investigates how to choose the position of concrete circulating processing center from different aspects. The main harvest and working process are as follows.
     Through literary review and field survey, the paper introduces the national production ability of cement clinker and concrete production in 2008, analyzes the serious situation resulted from the unreasonable positioning of the concrete enterprises in a local area. The paper also introduces the concrete production ability and demand in northeastern region. It is necessary to construct new concrete circulating processing centers or reconstruct middle/small concrete factories into concrete circulating processing centers to meet the short supply situation resulted from the demand increasing and washing out small factories in order to meet the market requirement.
     The paper briefly summarizes J.H. Von Thunen's agriculture location theory, Alfred Weber's industrial location theory, T. Palander and M. Hoover's location theory and A. Losch's marketing location theory, and classifies concrete material into omnipresence and local material according to the local theory principles. In accordance with the different weight transferring situations of the local material, we confirm that the main material of producing concrete, limestone, is the weight lost material. And the concrete additive material is basically omnipresence and theoretically supporting the positioning of concrete circulating processing center. The paper divides the continuous production process of concrete into two segments: cement clinker production and concrete production, and divides the concrete production logistics into cement clinker production logistics and concrete production logistics, which provides theoretical support for the construction and positioning of concrete circulating processing center. The paper demonstrates the models and the functions of concrete circulating processing center, especially the practical significance of the construction of concrete circulating processing center.
     The paper constructs the appraising model of positioning single concrete circulating processing center by combining the qualitative and quantitative methods. The positioning of concrete circulating processing center is a multi-objective programming with economics principle coming first. The objective function is lowest logistics cost according to the concrete natural characters, and the restrict conditions are as follows: production ability of concrete circulating processing center, supply ability of mixed material, and the concrete demand. Through quantitative calculation of concrete logistics cost, cement clinker logistics cost and mixture material logistics cost, the primary positioning of single concrete circulating processing center is finished. Based on the primary positioning, together with the MDHGF integrated model, the single concrete circulating processing center is appraised and final positioning is made. The model of positioning is also applied for a big scale concrete enterprises' single concrete circulating processing center in northeastern China and the result is accordant.
     The paper constructs the positioning model of multi-concrete circulating processing center through a Mixed integer programming method. For the model is NP program, the method of greedy algorithm is applied and the result is satisfied. The paper also validates the MDHGF model by positioning a big scale concrete enterprises' multi-concrete circulating processing center in northeastern China and the result is accordant. This proves that the model and arithmetic are scientific and reliable.
     Because there is not only one concrete enterprise in a region, it is in fact a positioning program of cooperation or competition based on multi-behavior of many people. Finally it is cooperation. The paper raises multi-behavior positioning model of concrete circulating processing center and also the way of saving logistics cost and how to share profit. The model is applied in a local area in the northeast and reliable.
     The paper's highlight is as follows:
     (1 )Based on industrial location theory, the paper puts forward a pioneer thinking of optimizing logistics system by construction concrete circulating processing center and dividing the concrete production process into cement clinker production and concrete production, and also studies the multi-behavior positioning model concrete circulating processing center in reality.
     (2)Divide single concrete circulating processing center into two steps: roughly positioning single concrete circulating processing center by quantitative method, applying MDHGF integrated model evaluating positioning. By separating positioning single concrete circulating processing center into steps, it makes calculating more efficient and results more reliable.
     (3)For the program of positioning of multi-concrete circulating processing center, the objective function is min (construction cost+ logistics cost). Founded model of mix integral planning and raised greedy algorithm. The advantage of the model is it can calculate the numbers of the concrete circulating processing center and location, and also can assign concrete demand position, cement clinker supply station mixed material factories to the new concrete circulating processing center. The calculation method is simple but it can fit requirement.
     (4)Taking fair Shapley value (potential value), sharing the logistics cost saved by multi-people cooperation constructing concrete circulating processing center, the assigning planning is fair, reasonable, and considers all parties profit.
     (5)The paper applies the model into validating, the results of the validating fits the big enterprises' strategic planning and national industry policy. The paper raises scientific and reasonable decision gist for northeast local area constructing concrete circulating processing center. The cooperated multi-concrete processing center profit assign method can promote multi-cooperation. The paper supports reduction of numbers of concrete factories, increasing scales of the factories.
引文
[1]蔡玉良.对水泥工程技术研发设计理念及其变化的思考[J].中国水泥,2005,(6):14-17.
    [2]中国水泥协会信息部.2008年中国水泥产量快报[EB/OL].[2009-01-28].http://www.dce ment.com/Article/200902/71695.html.
    [3]中国水泥协会信息部.2008年1~12月全国大型水泥集团水泥、熟料产量排名[EB/OL].[2009-02-16].http://www.dcement.com/hyfenxi/ShowArticle.asp?Arti cleID=71578.
    [4]中华人民共和国国家发展与改革委员会.水泥工业产业发展政策[EB/OL].[2006-10-20].http://www.china.com.cn/policy/txt/2006-10/20/content_9252555.htm.
    [5]中国水泥协会信息部.2008年中国水泥企业百强排行榜[EB/OL].[2009-01-20].http://www.ccement.com/zhuanti/08paihang/.
    [6]昃向祯.要重视水泥工业合理布局与合理规模[J].中国水泥,2005,(6):18-24.
    [7]贺鹏飞,胡怡琳.浙江水泥产能过剩协会上书调控,政府表态不干预[DB/OL].[2007-07-30].http://www.p5w.net/news/cjxw/200707/t1119937.htm.
    [8]浙江省水泥协会.浙江水泥全面进入新型干法工艺时代[DB/OL].[2007-11-20].http://www.bmlink.com/news/html/news_Info82_0912799317_6.html.
    [9]庄春来.循环经济—水泥行业可持续发展的有效途径[J].中国水泥,2005,(3):15-19.
    [10]曾学敏.我国石灰石资源及开采综述[DB/OL].[2005-03-20].http://www.cncecn cement.com.cn/hyfw/mrgd0.asp?newsid=9.
    [11]中国矿产资源—水泥石灰岩矿资源[DB/OL].[2005-03-20].http://www.chinami namining.com.cn/report/de-fault.asp?V_DOC_ID=1301.
    [12]高长明.努力实现水泥熟料生产对电能的零消耗[DB/OL].[2009-04-02].http://http://www.sxcoal.com/coal/348722/print.html.
    [13]W.A.H.Thissen,P.M.Herder.Critical Infrastrtures:State of the Art in Research and Applicat[M].Boston:Kluwer Academic Publishers,2003.
    [14]P.M.Ghare,D.C.Montgomery,W.C.Turner.Optim Interdiction Policy for a Flow Network[J].NaResearch Logistics Quarterly,1971,18(1):37-45.
    [15]Hakimi,S.L.Optimum locations of switching centers and the absolute centers andmedians of a graph.Operations Research,1964,12:450-459.
    [16]Kariv O.Hakimi S,An algorithmic approach to network location problems[J]. Thep-Medians,SIAM Journal on Applied Mathematics,1979,37(6):539-560.
    [17] Z.Drezner,Wesolowsky GO. A new method for the multifacility minimax location problem. Journal of the operational research society, 1978,24(4): 1507-1514.
    [18] Revelle Laporte. The plant location problem: New models and research prospects[J]. Operations Research , 1996 , 44 (8): 864-874.
    [19] Cornuejols G.,M.Fisher and G.L.Nemhauser. On the incapacitated location problem[J]. Annals of Discrete Mathmatics, 1977,15(1): 163-177.
    [20] Swain R. A parametric decomposition approach for the solution of uncapacitated location problems[J].Management Science,1974,21(5):189-198.
    [21] Barros A.and M.Labbe.A general model for the incapacitated facility and depot location problem[J].Location Science 1994,34(2): 173-191.
    [22] Holmberg K. Exact solution methods for incapacitated location with convex transportation costs[J]. European Journal of Operational Research, 1998,114(8): 127-140.
    [23] ReVelle Laporte. The plant location problem: New models and research prospects[J]. Operations Research, 1996,44 (6): 864-874.
    [24] Scott. Dynamic location allocation systems : Some basic planning strategies[J]. Environment and Planning, 1971, 27(3):73-82.
    [25] Wesolowsky, Truscott. The multiperiod location allocation problem with relocation of facilities[J]. Management Science, 1976, 22 (9):57-65.
    [26] Sheppard. A conceptual framework for dynamic location allocation analysis[J]. Environment and Planning, 1974, 30(6):547-564.
    [27] Geoffrion Graves. Multicommodity distribution system design by benders decomposition[J]. Management Science, 1974, 20 (5): 822-844.
    [28] Pirkul, Jayaraman. A multi-commodity, muti-plant, capacitated facility location problem: formulation and efficient heuristic solution [J]. Computers & operational research, 1998, 25 (12): 869-878.
    [29] Lee C.Y. An algorithm for a two-staged distribution system with various types of distribution centers [J]. INFOR, Canadian Journal of Opera-tonal Research and Information Processing, 1996, 34 (3): 105-117.
    [30] Mazzola Neebe. Lagrange-relaxation-based solution procedures for a multiproduct capacitated facility location problem with choice of facility type [J]. European Journal of Operational Research, 1999, 115 (9): 285-299.
    [31] Barros Dekker, Scholten. A two-level network for recycling sand: A case study [J]. European Journal of Operational Research,1998,110(24) 199-214.
    [32]Huff D.L.Defining and estimating a trading area[J].Journal of Marketing,1964,28(6):34-38.
    [33]Nakanishi M.Cooper L.G.Parameter estimates for multiplicative competitive interaction models least square approach[J].Journal of Marketing Research,1974,47(11):201-311.
    [34]马云峰.网络选址中基于时间满意的覆盖问题研究[D].华中理工大学,2005年10月.
    [35]蔡希贤,夏士智.物流合理化的数量方法[M].武汉:华中理工大学出版社,1985年.
    [36]范碧霞.集合覆盖模型在物流中心选址中的应用[J].决策&信息,2008,(9):49-50.
    [37]宋晓晨.集合覆盖问题的遗传算法求解方法[J].黑龙江工程学院学报(自然科学版),2007,21(3):36-40.
    [38]张显东,梅广清.市场竞争条件下的供应商选址模型研究[J].运筹与管理,1998,7(2):65-68.
    [39]杨丰梅,华国伟,黎建强.一个竞争选址问题的新模型及其求解算法[J].系统工程理论与实践,2007,(3):58-62.
    [40]董祥俊.动态选址在铁路施工企业物资管理中的应用[J].铁路采购与物流,2007,(11):20-23.
    [41]王巍,姚家奕.基于物流网络布局与设施选址动态因素的神经网络—遗传算法的研究[J].北京交通大学学报(社会科学版),2005,5(3):41-47.
    [42]陆立娟,李大卫.逆向物流中心动态选址问题的研究[J].鞍山科技大学学报,2007,30(2):150-154.
    [43]常玉林.城市紧急服务系统优化选址模型[J].江苏理工大学学报,1998,(5):44-48.
    [44]尹传忠.不确定需求的铁路行包配送点选址模型[J].上海海事大学学报,2008,(3):67-71.
    [45]杨卫平.一类多产品设施选址问题研究[J].成组技术与生产现代化.2007,24(1):38-40.
    [46]蒋忠中,汪定伟.B2C电子商务中配送中心选址优化的模型与算法[J].控制与决策,2005,20(10):1125-1136.
    [47]韩庆兰,梅运先.基于BP人工神经网络的物流配送中心选址决策[J].中国软科学,2004,(6):79-84.
    [48]伊俊敏.物流工程[M].北京:电子工业出版社,2005第一版.
    [49]刘继生,张文奎,张文忠.区位论[M].江苏:江苏教育出版社,1994年12月.
    [50][德]约翰·冯·杜能.孤立国同农业和国民经济的关系[M].吴衡康译.北京:商务印书馆.1997年4月.
    [51]王铮,邓悦,葛昭攀等.理论经济地理学[M].北京:科学出版社,2002年5月.
    [52][德]阿尔弗雷德·韦泊.工业区位论[M].李刚剑,陈志人,张英译.北京:商务印书馆.1997年.
    [53]江淑文.阿尔弗雷德·韦伯的工业区位理论述评[J].经济管理,2005,6:43-44.
    [54]张文忠,张军涛.经济学和地理学对区位论发展轨迹的影响[J].地理学科进展.1999,18(1):54-59.
    [55][美]埃德加·M·胡佛.区域经济学导论[M].王翼龙译,北京:商务印书馆,1990年11月.
    [56]张小林,刘继生,冯春萍.人文地理学导论[M].北京:测绘出版社,1995年6月.
    [57]李小建,经济地理学[M].北京:高等教育出版社,2006年.
    [58]张天踢.平面选址问题概述[J].运筹学杂志,1985,(1):4-11.
    [59][蒋长兵.物流系统与物流工程[M].北京:中国物资出版社,2005年1月第一版.
    [60]杜文.物流运输与配送管理[M].北京:中国机械工业出版社,2007年8月.
    [61]郑宗汉,郑晓明.算法设计与分析[M].北京:清华大学出版社,2005年6月.
    [62]杨和雄.中位问题综述[J].南京邮电学院学报,1989,9(3):110-115.
    [63]Mirchandani P.B,Francis R.L.Discrete Location Theory[M].American:John Wile & Sons.1990.
    [64]于紫薇,刘彦佩.路状网络的最优连接及最优定位问题[J].北方交通大学学报,2001,25(6):103-108.
    [65]付朋辉,康立山,阎震宇.用多目标演化优化算法解决约束选址问题[J].计算机工程与设计,2003,24(3):1-3.
    [66]中华人民共和国国家标准.GB5947-86水泥定义和名词术语[S].北京:中国标准出版社,1986-6-1.
    [67]中华人民共和国国家标准.GB175—2007通用硅酸盐水泥[S].北京:中国标准出版社,2007-12-1.
    [68]姜山.东北水泥行业发展研究[D].长春:长春理工大学硕士论文,2006.
    [69]天津水泥工业设计研究院.吉林亚泰水泥有限公司5000吨/日水泥熟料生产线建设工程可行性研究报告[R].2007年5月.
    [70]天津水泥工业设计研究院.吉林亚泰水泥有限公司哈尔滨80万吨/年粉磨站建设工程可行性研究报告[R].2008年5月.
    [71]李坚立,周惠群.水泥生产工艺[M].武汉:武汉理工大学出版社.2008年7月.
    [72]甘卫华,尹春敏.现代物流基础[M].北京:电子工业出版社,2005年5月.
    [73]中国药港网.流通加工的类型和方法[EB/OL].[2006-05-10].http://www.zj56.co m.cn/zxzx/List02.asp?ID=11311.
    [74]潘安定,林媚珍,张汝国.物流技术与设备[M].广州:华南理工大学出版社,2005年.
    [75]黄中鼎.现代物流管理学[M].上海:上海财经大学出版社,2004年.
    [76]流通加工的地位及作用[EB/OL].[2008-02-18].http://www.zj56.com.cn/zxzx/list 02.asp?id=32506.
    [77]汝宜红.物流学导论[M].北京:北方交通大学出版社,2004年.
    [78]高学贤,郝增亮.现代物流管理学[M].北京:中国铁道出版社,经济科学出版社,2007年8月.
    [79]王转.物流系统工程[M].北京:高等教育出版社,2004年06月.
    [80]中国建材报.中国和世界水泥工业现状与世纪展望[EB/OL].[2005-06-20].http://www.chinabmnet.com/bxpd/jczsh/jczsh-8.htm.
    [81]国家发展改革委、科技部、国家环保总局2005年第65号.国家鼓励发展的资源节约综合利用和环境保护技术[EB/OL].[2005-10-28].http://www.falvfagui .com//fazhangaige/200510/fagui_528462.html.
    [82]Ronald H.Ballou.企业物流管理——供应链的规划、组织和控制[M].王晓东,胡瑞娟等译.北京:机械工业出版社,2008年6月第二版.
    [83]严冬梅.城市物流中心选址问题研究[D].天津:天津大学管理学院博士论文,2004年11月.
    [84]中国水泥网.循环经济理论与水泥可持续发展[EB/OL].[2005-03-15].http://ww w.standardcn.com/article/show.asp?id=1737.
    [85]郜振华.配送中心选址模型与算法研究[D].南京:南京大学博士论文,2005年6月.
    [86]陈莉,刘晓霞.离散数学[M].北京:高等教育出版社,2002年.
    [87]王志平,王众托.超网络理论及其应用[M].北京:科学出版社,2008年6月.
    [88]王帅,董千里.用MDHGF算法对综合物流网络的评价[EB/OL].[2008-05-21]. http://jpkc.chd.edu.cn/gjwlx/bbsxp/ShowPost.asp?ThreadID=7932.
    [89]徐维祥,张全寿.一种基于灰色理论和模糊数学的综合集成算法[J].系统工程理论与实践,2001,(4):114-119.
    [90]崔和瑞,刘晓东.Delphi法和AHP法在物流中心选址中的应用[J].系统工程,2006,(7):34-37.
    [91]柯群.德尔菲法[J].科学管理研究,1982,(5):11-12.
    [92]王威,赵福军,郑金忠.基于AHP方法的物流中心选址研究[J].物流技术,2005,(8):58-60.
    [93]Satty T.The Analytica Hierarchy Process[M].New York:Mcgraw-Hill,1980.
    [94]邓聚龙.灰色系统理论教程[M].武汉:华中理工大学出版社,1988年.
    [95]刘思峰,党耀国,方志耕.灰色系统理论及其应用[M].北京:科学出版社,2004年第三版.
    [96]谢季坚.模糊数学及其应用[M].武汉:华中理工大学出版社,2000年第二版.
    [97]李柏年.模糊数学及其应用[M].合肥:合肥工业大学出版社,2007年.
    [98]曹成洲.基于灰色理论和模糊数学综合集成算法的第三方物流企业绩效评价体系研究[J].物流科技,2007,(8):04-07.
    [99]刘文歌.基于DHGF理论配送中心选址研究[D].大连:大连海事大学硕士论文,2006年2月.
    [100]秦进.多商品物流网络设计相关优化模型及算法研究[D].中南大学博士学位论文,2006年6月.
    [101]Sun M H,Solving the incapacitated facility location problem using tabu search [M],Computers & Operations Research,2006.
    [102]Beckmann M J.Economic Models of Knowledge Networks,Networks in Action[M].1995.
    [103]Wang Jun.A knowledge network constructed by integrating classification,thesaurus,and metadata in digital library[J].International Information & Library Review,2003.
    [104]Jarvenpaa S K,Tanriverdi H.Leading virtual knowledge networks[J].Organizatio-onal Dynamics,2003,31(4):403-412.
    [105]秦绪伟.物流系统集成规划模型及优化算法研究[D].中国科学院研究生院(沈阳自动化研究所)博士论文,2006年7月.
    [106]Aikens C H.Facility location models for distribution planning[J],European Journal of Operational Research,1985,22,(3):263-279.
    [107]Tanignchi E,Noritake M.Optimal size and location planning of public logistics terminals[J].Transportation Research Part E,1999,35(2):207-222.
    [108]姜启源,谢金星,叶俊.数学模型[M].北京:高等教育出版社,2003年8月第3版.
    [109]汪贤裕,肖玉明.博弈论及其应用[M].北京:科学出版社,2008年2月.
    [110]水泥商情网.吉林长春开工150个重大项目 水泥需求或上亿吨[EB/OL].[2009-03-20].http://china.toocle.com/cbna/item/2009-03-20/4474879.html.
    [111]曹云忠.物流中心选址算法改进及其Hopfield神经网络设计[J].计算机应用与软件,2009,26(3):117-120.
    [112]孙焰,郑文家.基于重心模型和层次分析法的配送中心选址研究[J].物流科技,2009,(3):33-35.
    [113]秦小辉.基于时间满意度的体化物流网络随机优化模型[J].铁路运输与经济,2009,31(1):55-57.
    [114]李振克,耿尚忠,熊哲华.基于AHP-Fuzzy理论的军事物流配送中心选址研究[J].物流技术,2009,(3):133-136.
    [115]吴竞鸿.新华书店的区域配送中心选址模型[J].物流技术,2009,(3):56-59.
    [116]刘必争,毛超.电子商务下的配送中心选址问题及其优化[J].系统工程,2008,26(10):17-21.
    [117]张路.单一物流配送中心选址分析[J].交通科技与经济,2008,49(5):104-106.
    [118]高学东,李宗元.物流中心选址模型及一种启发式算法[J].运筹与管理,1991,3(4):56-61.
    [119]梁朝明,阮建庆.发展水泥现代物流挖掘水泥业节能减排潜力[J].物流技术,2008,(6):31-34.
    [120]汪志刚,孙超平.影响水泥企业发展的主要因素与对策[J].科技与产业,2009,9(2):20-22.
    [121]李景芳.对加快农村散装水泥物流配送体系建设的探讨[J].散装水泥,2008,(3):38-39.
    [122]王强,陈圻,郑金忠.R&D合作与非合作时双寡头定价选址博弈分析[J].统计与决策,2009,279(3):57-59.
    [123]郜振华,尹红坡.综合GAHP和目标规划的配送中心选址方法究[J].管理技术,2008,05(6):101-105.
    [124]张滢.物流中心选址的熵权法综合评价[J].生产力研究,2008,(10):108-120.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700