基于实测数据的泥水盾构施工参数相关性分析
详细信息    查看官网全文
摘要
为了保证隧道的施工质量并控制开挖对于周围环境的不良影响,泥水盾构施工过程须考虑到诸多施工参数的匹配和调整。本文以仙霞西路隧道施工实测数据为基础,采用SPSS等数理统计软件对泥水盾构施工参数之间的相关性进行了统计分析,对比分析了切口水压、总推力、盾构推进速度、回转角、俯仰角等主要施工参数之间的相关性,并阐述了施工参数之间复杂的相关特性与机理。分析结果表明:切口水压、盾构推速、干砂量是关键施工参数,在施工过程中需要合理设置并密切关注其变化。
In order to guarantee tunnel construction quality and control surrounding environment effects caused by excavating,we need consider construction parameters matching and adjustment during SPB shield tunnel.In this article,by studying the field data collected in the project of Xianxia West road tunnel with statistical software like SPSS,the interrelationship of the operation parameters of slurry shield is analyzed.Then the interrelationship between main parameters,such as slurry pressure,jack force,shield driving speed,rolling angle and pitching angle,are analyzed and compared respectively.Also the complex interrelationship and its mechanism are elaborated.The analysis results show that slurry pressure,jack force,and dry-sand are key parameters,we need reasonable setting and pay attention to their variation.
引文
[1]Sugimoto,M.,Sramoon,A..Theoretical Model of Shield Behavior During Excavation.I:Theory.Journal of Geotechnical and Geoenvironmental Engineering,February,2002:138-155.
    [2]朱合华,徐前卫,廖少明,等.土压平衡盾构法施工参数的模型试验研究[J].岩土工程学报,2006,28(5):553-557.(Zhu Hehua,Xu Qianwei,Liao Shaoming.Experimental study on working parameters of EPB shield machine[J].Chinese Journal of Geotechnical Engineering,2006,28(5):553-557.(in Chinese))
    [3]王洪新,付德明.土压平衡盾构掘进的数学物理模型及各参数间关系研究[J].土木工程学报,2006,39(9):86-90.(Wang Hongxin,Fu Deming.A mathematical model and the related parameters for EPB shield tunneling[J].China Civil Engineering Journal.2006,39(9):86-90.(in Chinese))
    [4]李章林.超大直径泥水平衡盾构施工时建筑物保护技术研究[J].地下空间与工程学报,2011,7(1):1471-1473.(Li Zhanglin.Study of Protecting Structure during Super-Diameter Slurry-Pressure Balanced Tunnel Boring Machine Work[J].Chinese Journal of Underground Space and Engineering,2011,7(1):1471-1473.(in Chinese))
    [5]周文波,胡珉.盾构法隧道施工主要参数控制方法研究[J].岩石力学与工程学报,2003,22(1):2430-2433.(Zhou Wenbo,Hu Min.Control Study on Major Parameters for Shield Tunneling[J].Chinese Journal of Rock Mechanics and Engineering,2003,22(1):2430-2433.(in Chinese))
    [6]颜波,杨国龙.盾构隧道施工参数优化与地表沉降控制研究[J].地下空间与工程学报,2011,7(z2):1683-1687.(Yan Bo,Yang Guolong.Reasearch on Shield Tunneling Parameters Optimization and Surface Subsidence Control[J].Chinese Journal of Underground Space and Engineering,2011,7(z2):1683-1687.(in Chinese))
    [7]白云,孔祥鹏,廖少明.泥水盾构泥膜动态形成机制研究[J].岩土力学,2010,31(z2):19-24.(Bai Yun,Kong Xiang peng,Liao Shao ming.Research on dynamic formation mechanism of slurry membrane for slurry shield[J].Rock and Soil Mechanics,2010,31(z2):19-24.(in Chinese))

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700