城市桥梁超高顶升改造施工
详细信息    查看官网全文
摘要
桥梁顶升施工工艺,从最早的顶升高度小、同步性较差,发展至今顶升高度可达十余米,同步精度控制在2mm以内,能满足现有桥梁的改造需求。全国范围内桥梁顶升高度均小于10m,超过10m的国内施工案例较少,以厦门仙岳路与成功大道提升改造工程顶升项目为例,总结在桥梁超高顶升施工过程中的其安全性、稳定性、精确性。
Lifting bridge construction process,from the earliest lifting height of a small,poor synchronization,the development has lifting height up to ten meters,the synchronization precision control in less than 2mm,to meet the needs of the transformation of existing bridges.Lift height of bridge is less than ten meters in our country,then the height over ten meters buildings are less,Taking the Xiamen Xianyue road and Chenggong avenue reconstruction project for example,the security,stability and accuracy in the ultra-high bridge lifting construction process are summarized.
引文
[1]章柏林.连续梁桥超高调坡顶升关键技术[C]//第十届建筑物改造与病害处理学术研讨会、第五届工程质量学术会议论文集.2014.
    [2]邱湧彬,刘世忠,李丽园.顶升技术在城市桥梁改造中的应用[J].施工技术,2013,42(5):62-66.
    [3]蒋岩峰,蓝戊已.桥梁整体顶升关键技术研究[J].建筑结构,2007(S1):547-549.
    [4]夏洪波,刘世忠,刘志翁,等.单箱五室连续弯箱梁桥旋转的顶升关键技术[J].兰州交通大学学报,2012(4):36-40.
    [5]游炜.城市桥梁改造中的既有连续梁桥顶升技术改造[J].福建建筑,2015(5):78-81.
    [6]邱湧彬,刘世忠,李丽园.顶升技术在城市桥梁改造中的应用[J].施工技术,2013,42(5):62-66.
    [7]李国雄.大体量建筑大位移整体顶升技术[J].施工技术,2013,42(16):50-53.
    [8]史军,黄林伟,杨桦.既有建筑高位基础加固及顶升纠倾施工[J].施工技术,2014,42(2)2:78-80,83.
    [9]张卫喜,陈平,赵冬.开封玉皇阁整体顶升施工技术[J].施工技术,2010,39(11):48-50,106.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700