新管幕法顶管施工实施的风险分析与控制技术
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:Risk Analysis and Control Technology of New Pipe Curtain Pipe Jacking Construction
  • 作者:李腾
  • 英文作者:Li Teng;
  • 关键词:风险分析 ; 关键风险因素 ; 防范措施
  • 英文关键词:risk analysis;;key risk factors;;preventive measures
  • 中文刊名:JZKF
  • 英文刊名:Building Technology Development
  • 机构:中铁十四局集团第二工程有限公司;
  • 出版日期:2019-03-25
  • 出版单位:建筑技术开发
  • 年:2019
  • 期:v.46;No.408
  • 基金:国家重点研发计划项目(2018YFC0808700)
  • 语种:中文;
  • 页:JZKF201906045
  • 页数:2
  • CN:06
  • ISSN:11-2178/TU
  • 分类号:86-87
摘要
新管幕法顶管施工是一种新型管道埋设施工技术。依托新管幕法顶管施工特点,为有效识别出太原市迎泽大街下穿火车站通道工程施工中的关键风险因素,采用基于模糊推理系统改进的故障模式和影响分析方法进行风险分析。研究发现:(1)运用该方法分析新管幕法顶管施工风险,得到其关键风险因素,主要有顶进时地面隆起、沉降,出洞时,洞口周遭土体变形破坏,顶管机就位时导轨安装不稳或千斤顶偏差等,风险分析结果与工程实际情况较吻合;(2)在工程施工前设计合理技术方案,给出风险预处理措施,控制风险影响因素,并且探究新管幕法顶管施工过程中的风险原因,对工程方案进行优化。
        Pipe jacking construction with new pipe curtain method is a kind of pipeline burying construction technology without excavation or less excavation. In view of the characteristics of the new pipe curtain pipe jacking technology,in order to effectively identify the key risk factors in the construction of the tunnel project of Yingze Street under the railway station in Taiyuan City,the improved fault mode and impact analysis method based on the fuzzy inference system are used to carry out risk analysis. It is found that :(1)by using this method,the risk of pipe jacking construction with new pipe-curtain method is analyzed,and the key risk factors are obtained,such as ground settlement or uplift during jacking,soil damage around the hole,unstable installation of guide rail or Jack deviation from track center when the new pipe-curtain method pipe jacking machine is in place,etc,the risk analysis results are in good agreement with the actual situation of the project;(2)make necessary decisions before the implementation of the project,take corresponding preventive measures,so as to greatly reduce the risk,and compare the various risks in the implementation of the new pipe-curtain pipe jacking technology,find out the reasons to optimize its project plan.
引文
[1]刘增龙.超长管幕暗挖法下穿机场跑道沉降变形研究[D].北京:北京交通大学,2015.
    [2]朱小宁.兰州市污水全收集工程管道施工工艺及顶管技术研究[D].兰州:兰州交通大学,2015.
    [3]杨慧林.北京地区采用新管幕工法修建深埋地铁暗挖车站方案初探[J].铁道标准设计,2012(12):72–77.
    [4]李毅佳,余建星.基于FMEA和模糊理论的海底管道建造期质量风险分析[J].中国安全科学学报,2012,22(1):112–117.
    [5]程敏,曹义敏.基于模糊FMEA的长距离输水管线顶管施工风险分析[J].中国安全科学学报,2013,23(9):76–82.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700