变电站的施工流程和标准关系着变电站的运行情况,其中GIS设备和变压器的安装尤为重要。本文首先对GIS设备和变压器进行简要的介绍,然后从安装注意事项、安装技术和质量检测三个方面介绍GIS设备安装技术,从定位、附件和运行前操作介绍变压器安装技术,为人们提供初步的了解。
The construction process and standard of substation are related to the operation of substation, especially the installation of GIS equipment and transformer. Firstly, this paper briefly introduces GIS equipment and transformer, then introduces the installation technology of GIS equipment from three aspects: installation precautions, installation technology and quality inspection, and introduces the installation technology of transformer from positioning, accessories and operation before operation, so as to provide people with a preliminary understanding.