摘要
为将多用途模块式先进小型压水堆(ACP100)堆芯换料周期提升至24个月,兼顾良好的燃料利用率并保证功率展平特性满足安全性的限值要求,本文使用具备工程经验的成熟软件,进行不同的批料数、不同富集度组合、不同径向装载模式等组合方案的燃料管理研究,通过研究掌握了不同策略特征并形成ACP100堆芯燃料管理推荐策略:选取3批次换料、24盒组件/批的倒料策略,结合部分低泄漏装载模式,作为ACP100堆芯燃料管理推荐策略,同时进一步提高燃料富集度以提升燃料经济性。
In order to achieve 24-months cycle length for Advanced Small Modular Pressurized Reactor(ACP100), and keep a balance between good fuel utilization and flat power distribution to assure reactor safety, using the well-developed software applied in engineering practice, this paper construct cases with combination of different number of assemblies per batch, enrichment types, and radial loading patterns; characteristics analysis of these cases could be referred during the confirmation of fuel management strategy of ACP100 reactor, and a recommended strategy is attained: combination of 3 batch loading and 24 assemblies per batch, along with partial low leakage loading pattern, and a higher enrichment to improve fuel economics.
引文
[1]吴磊,于涛,李天涯,等,混合富集度燃料管理策略研究[J].中国核电,2016,9(S1):18-22.
[2]谢仲生.核反应堆物理分析[M].西安:西安交通大学出版社,2004.