摘要
为解决伊敏一号露天煤矿采区转向带来的一系列问题,对原采煤运输系统进行改造。将一号破碎站和东端帮带式输送机系统移至西端帮,将三号自移式破碎机采煤工作面流向改为由东向西,三号破碎系统搬迁至西段帮,改造后的采煤运输系统消除了原有系统的不利因素。
In order to solve a series of problems caused by mining area steering, Yimin No.1 Open-pit Mine transforms the original coal mining transportation system. The mine transfers No.1 crushing station and east slope belt conveyor system to west slope, and changes the direction of No.3 self-moving crusher coal mining working face from east to west. No.3 crushing system moves to west slope, which eliminates the unfavorable factors of original system.
引文
[1]李铁东.伊敏露天煤矿采煤运输系统改造工程方案设计[R].呼伦贝尔:华能伊敏煤电有限责任公司,2013.
[2]孙玉利.伊敏煤矿一期地面生产系统改造[J].露天采矿技术,2011(1):26-28.
[3]李伟,李继,曹慧.伊敏露天矿采区扇形转向系统优化布置[J].露天采矿技术,2014(6):5-7.
[4]付廷胜,姚志勇,范正祥.伊敏一号露天矿采区转向过渡的分析[J].露天采矿技术,2006(1):12-13.
[5]李树学,袁金祥.半连续工艺在伊敏露天矿的应用[J].露天采矿技术,2011(1):5-8.
[6]李树学,刘建国,张兵华.伊敏露天矿半连续工艺系统移设分析[J].露天采矿技术,2007(4):1-2.