Formation Conditions of the Karst Collapse and Treatment Technology at Raker’s Substrate in a Karst Mine
详细信息   
摘要


     The raker’s substrate,situated in a karst mine in southern China,is composed of silty clay,peb-bles and limestone.In June 2009 a 3m long and 2m wide collapse took place,causing the raker being buried in a cave.The collapse seriously threatens the safety of the surrounding tailing depot and cement tank.Anal-ysis and simulation show that the collapse of the substrate is mainly led by strongly developed karst frac-tures,groundwater table fluctuation and long-term water scour that resulting bedrock surface soil particles being brought out and then causing the cave to collapse.The former treatment for collapse is backfill gener-ally,but re-collapse is frequent.In view of the case,the mud hole rotary j et grouting approach in the treat-ment is adopted this time.That is to say,accelerator of different ratio is added to the cement paste according to the depth firstly,and then,putting the accelerator-added cement paste rapidly into the hole and cutting the surrounding soil layer by high pressure and high speed revolving,which leading the pure cement paste turning into cement clay slurry.Under high pressure,the slurry can split off the soil layer,thus,the cave entrance can by blocked off rapidly and the soil layer be consolidated.Test results show that this method can not only seal the passage of cave and karst fractures and reinforce the soil very well,but also has mature technology and lower cost than grouting.It is suitable for application in karst mine.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700