用户名: 密码: 验证码:
Optimized Design of Trajectory for Middle-Shallow Horizontal Well and the Site Construction
详细信息   
摘要


     Low drilling efficiency was caused by large friction and high torque in drilling and casing running process in mid- die-long and long horizontal wells in Daquing oilfield and the borehole wall collapsing led by long time contact with drilling fluid further slowed down the construction speed. The stimulation was made to rationally design the well trajectory according to different profile types, build-up rates and frontal distances to hitting target to reduce the friction and torque in drilling and casing running process and provide technical support for the smooth construction of middle-long and long horizontal wells.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700