用户名: 密码: 验证码:
Incentive Mechanism of Plane-Shoving Slide Collapsing Dangerous Rock and the Control Measures
详细信息   
摘要
Take the example of plane-shoving slide collapse in Tongjiang,by the analysis on the formation conditions and incentive mechanism,the control measures are obtained.For the shape,a group of paralleled tension cracks develop above the steep rock with width of 1m,both sides is enclosed.In heavy rainfall,the surface water flow into the cracks,in addition to the hydrostatic pressure and hydrodynamic pressure,the splitter action of instantaneous high head in cracks promotes the development of cracks.At the same time,the sand stone layer of the upper part will push outward along the weak interlayer;while the free surface is produced by extruding shift,collapsing will occur.This model is plane-shoving shift,collapsing,shift again and collapsing again.In order to eliminate the hidden troubles of this type of landslide disasters,in the premise of collapse control,reducing effects of water on the slope must also be considered,as well as the engineering measures to prevent cracks.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700