摘要
A gas well site is located in a fill platform,the landslide disaster occurred for 3 times,because the soil filling was not consolidated when the construction was started.The treatment solutions for 3 landslides were ground drainage + grouting reinforcement + anti-slide pile,the anti-slide pile + retaining wall reinforcement and micro combination anti-slide pile.Based on the characteristics of landslide in the natural gas well fill,the treatment engineering and the effects are analyzed,and the action effects of micro combination anti-slide pile technology used in this landslide treatment is especially analyzed.