用户名: 密码: 验证码:
Technical Measures to Increase Work-Efficiency and Ensure Quality of Pile Bottom Grouting for Bored Pile
详细信息   
摘要

Pile bottom grouting for bored pile means grouting cement slurry into the sediment and surrounding soil mass to largely increase their strength by fully filling the soil pore of the sediment at the pile tip and the soil mass to a certain range. By the physical and chemical effect, the strength was greatly enhanced to increase the vertical bearing capacity of single pile. Based on the construction practice of pile bottom grouting for bored pile of high speed railway, the paper introduced two kinds of grouting process and elucidated the importance of improving working efficiency.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700