In order to assess the stability of a tailing dam, all hidden geological structures must be identified under a tailing dam. A geophysical survey using associated electrical profile method and high-density electrical method was conducted at the tailing dam site of Xiadianzi iron ore processing plant in
© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号 地址:北京市海淀区学院路29号 邮编:100083 电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700 |