摘要
针对黄龙带水库坝基扬压力个别测点出现扬压力偏高问题,结合大坝扬压力监测资料,建立扬压力统计模型,采用回归分析方法得到扬压力监控指标,对扬压力转异情况进行判别,根据扬压力偏高分析原因,有针对性采取加固处理方案,并与实测值进行对比分析,评价处理效果,可为其他类似工程提供参考。
In the case of high values of uplift pressure on the dam foundation of Huanglongdai Reservoir, combined with monitoring data and uplift pressure statisticalmodel, the monitoring index of uplift pressure is obtained by regression analysis, to get variation discriminant of dam foundation uplift pressure. According to the course analysis of the uplift pressure on the high side, the targeted reinforcement treatment plan is compared and analyzed with the measured value,and the treatment effects is evaluated. It can provide reference for other similar projects.
引文
[1] 张艳芳.大坝基础扬压力模型研究及其应用[D].南京:河海大学,2006.
[2] 乐金苟.三门峡大坝溢流坝7段基础扬压力变化规律初探[J].大坝观测与土工测试,1996(6):7-12.
[3] 杜吉新.丹江口大坝扬压力观测资料分析[J].水电自动化与大坝监测,2004(2):54-56.
[4] 贾彩虹.老坝渗流的敏感性研究[D].南京:河海大学,2002.
[5] 张乾飞.复杂渗流场演变规律及转异特征研究[D].南京:河海大学,2002.
[6] 陈良.复杂坝基上重力坝的渗流分析及深层抗滑稳定性安全评价[D].南京:河海大学,2002.
[7] 张志刚,邓钦.黄龙带水库大坝sy7测孔扬压力偏高成因分析及其影响[J].广东水利水电,2009(4):27-33.
[8] 薛建峰,蒋裕丰.古田溪一级大坝坝基扬压力异常成因解析[J].三峡大学学报,2007(8):299-303.