国家体育场钢结构施工过程模拟分析
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
简要介绍了在国家体育场设计中确定大跨度钢结构安装方案的原则、临时支撑塔架布置与主要安装步骤,采用逐次“激活”单元技术对钢结构安装过程进行模拟计算。计算分析表明,施工顺序对构件的内力与变形有显著的影响。通过对构件安装顺序的调整,可以达到结构优化、降低用钢量、加快施工进度的目的。对临时支撑塔架反力与钢结构卸载变形量进行了估算,并对安装误差产生的原因、肩部与顶面次结构后装引起结构几何构型的变化情况进行了详细的分析,提出钢结构安装的技术要点。
The paper presents the principle for determining the largespan steel structure erection scheme,the layout and major erection procedures for temporary supporting tower in the design of the National Stadium.Some elements are reactivated step by step to simulate erection procedure of steel structure in structural calculation.The analytical results show that the erection sequence has great influence on internal force and deformation of the members.Structural optimization,saving of steel tonnage and shortening of construction period can be achieved by adjusting the erection sequence of the members.Reactive force of the temporary supporting tower and deformation of the steel structure after unloading of the temporary supporting tower are estimated.Causes for erection errors and changes in structural geometry caused by the post-erection of the secondary structure of the shoulder and the top surface are analyzed in details and key technical aspects for erection of the steel structure are proposed.
引文
[1]范重,吴学敏,郁银泉等.国家体育场大跨度钢结构修改初步设计[J].空间结构,2005,11(3):3-13.
    [2]范重,刘先明,范学伟等.国家体育场大跨度钢结构设计与研究[J].建筑结构学报,2007,28(2):1-16.
    [3]范重,刘先明,范学伟.国家体育场钢结构设计中的优化技术[J].建筑科学与工程学报,2006,23(2):20-29.
    [4]钱稼茹,纪晓东,范重等.国家体育场大跨度钢结构罕遇地震性能分析[J].建筑结构学报,2007,28(2):17-25.
    [5]中国建筑设计研究院.国家体育场钢结构卸载变形分析报告[R].2006.
    [6]范重,王,唐杰.国家体育场大跨度钢结构温度场分析与合拢温度研究[J].建筑结构学报,2007,28(2):32-40.
    [7]范重,范学伟,刘先明.焊接薄壁箱形构件设计方法研究[J].建筑钢结构进展,2006,8(3):34-40.
    [8]范重,彭翼,王等.国家体育场主结构扭曲箱形构件设计研究[J].建筑结构学报,2007,28(2):97-103.
    [9]范重,彭翼,王等.国家体育场屋盖次结构扭曲构件设计研究[J].建筑结构,2006,30(5):7-11.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心