引文
[1]王梦恕.对岩溶地区隧道施工水文地质超前预报的意见[J].铁道勘查,2004(1):7-9,18.WANG Mengshu.Hydrologic and geological forecast of tunnelconstruction in the karst district[J].Railroad Survey,2004(1):7-9,18.
[2]何刚,沙椿,丁陈奉,等.TSP-203系统数据采集的改进方案[J].地球物理学进展,2006,21(4):1332-1337.HE Gang,SHA Chun,DING Chenfeng,et al.Investigation ondata acquisition application of TSP-203system[J].Progress inGeophysics,2006,21(4):1332-1337.
[3]刘志刚.概论岩溶或地质复杂隧道隧洞地质灾害超前预报技术[J].铁道建筑技术,2003(2):1-5.LIU Zhigang.On advance geological forecast of tunnels on karstor varied geological conditions[J].Railway Construction Tech-nology,2003(2):1-5.
[4]李术才,李树忱,张庆松,等.岩溶裂隙水与不良地质情况超前预报研究[J].岩石力学与工程学报,2007,26(2):217-225.Ll Shucai,Ll Shuchen,ZHANG Qingsong,et al.Forecast ofkarst-fractured groundwater and defective geological conditions[J].Chinese Journal of Rock Mechanics and Engineering,2007,26(2):217-225.
[5]宗琦.岩石爆炸的扩腔作用及能量消耗[J].煤炭学报,1997,22(4):392-396.ZONG Qi.Function of cavity expansion and energy consump-tion in rock blasting[J].Journal of China Coal Society,1997,22(4):392-396.
[6]宋玉龙,吕公河,王新红,等.垂向叠加震源冲击波激发地震波的能量分析[J].石油地球物理勘探,2004,39(4):371-374.SONG Yulong,LU¨Gonghe,WANG Xinhong,et al.Analysis ofseismic energy produced by shock wave of vertical stack source[J].Oil Geophysical Prospecting,2004,39(4):371-374.
[7]王文龙.钻眼爆破[M].北京:煤炭工业出版社,1984.WANG Wenlong.Rock drilling blasting[M].Beijing:ChinaCoal Industry Publishing House,1984.
[8]张奇.岩石爆破的粉碎区及其空腔膨胀[J].爆炸与冲击,1990,10(1):68-75.ZHANG Qi.Small districts and expanding of cavities in rockblasting[J].Explosion and Shock Waves,1990,10(1):68-75.
[9]宗琦.岩石内爆炸应力波破裂区半径的计算[J].爆破,1994(2):15-17.ZONG Qi.Calculation of radii of the broken areas in rock byexplosion[J].Blasting,1994(2):15-17.
[10]戴俊.柱状装药爆破的岩石压碎圈与裂隙圈计算[J].辽宁工程技术大学学报:自然科学版,2001,20(2):144-147.DAI Jun.Calculation of radii of the broken and cracked areasin rock by a long charge explosion[J].Journal of LiaoningTechnical University:Natural Science,2001,20(2):144-147.
[11]A.H.哈卢卡耶夫.矿岩爆破的物理过程[M].刘殿中,译.北京:冶金工业出版社,1980.XAHYKAEB A H.Physical process of blasting in rock[M].LIU Dianzhong,Trans.Beijing:China Metallurgical IndustryPress,1980.
[12]高游,林君,于生宝,等.一种勘探瞬发电雷管起爆延时的高精度测试方法[J].爆破器材,2006,33(3):1-4.GAO You,LIN Jun,YU Shengbao,et al.A precise measur-ing method applicable to blasting delay time for instantaneousdetonator using in seismo-technique[J].Explosive Materials,2006,33(3):1-4.
[13]汪旭光,沈立晋.工业雷管技术的现状和发展[J].工程爆破,2003,9(3):52-57.WANG Xuguang,SHEN Lijin.The state-of-the-arts of indus-trial detonators[J].Engineering Blasting,2003,9(3):52-57.
[14]刘云祯.TGP隧道地震波预报系统与技术[J].物探与化探,2009,33(2):170-177.LIU Yunzhen.TGP tunnel seismic wave forecast system andits technology[J].Geophysical and Geochemical Exploration,2009,33(2):170-177.
[15]李夕兵,凌同华.单段与多段微差爆破地震的反应谱特征分析[J].岩石力学与工程学报,2005,24(14):2409-2410.LI Xibing,LING Tonghua.Response spectrum analysis ofground vibration induced by single deck and multi-deck blast-ing[J].Chinese Journal of Rock Mechanics and Engineering,2005,24(14):2409-2410.
[16]许振浩,李术才,张庆松,等.TSP超前地质预报地震波反射特性研究[J].地下空间与工程学报,2008,4(4):640-644.XU Zhenhao,LI Shucai,ZHANG Qingsong,et al.Reflectioncharacteristic of seismic wave in TSP advance geological pre-diction[J].Chinese Journal of Underground Space and Engi-neering,2008,4(4):640-644.
[17]Andisheh Alimoradi,Ali Moradzadeh,Reza Naderi,et al.Prediction of geological hazardous zones in front of a tunnelface using TSP-203 and artificial neural networks[J].TunnelUnderg Space Technol,2008,doi:10.1016/j.tust.2008.01.001.
[18]张庆松,李术才,孙克国,等.公路隧道超前地质预报应用现状与技术分析[J].地下空间与工程学报,2008,4(4):766-771.ZHANG Qingsong,LI Shucai,SUN Keguo,et al.Analysisand present state of advance geological forecast technology ofhighway tunnel[J].Chinese Journal of Underground Spaceand Engineering,2008,4(4):766-771.