引文
[1]Kvitrud A,Ersdal G,Leonardsen R L.On the risk ofstructural failure on Norwegian offshore installations[C].Proceedings of 11thInternational Offshore andPolar Engineering Conference[A].Stavanger(Nor-way):International Society of Offshore and Polar En-gineers,2001.4:459-464
[2]API RP-2A WSD.Recommended Practice for Plan-ning,Design and Constructing Fixed Offshore Plat-forms—Working Stress Design[S].API Recom-mended Practice 2A-WSD,21 Edition,2000
[3]ISO 19900.Petroleum and Natural Gas Industries-Offshore Structures-Part 1:General Requirements[S].International Standardization Organization,2002
[4]ISO/DIS 19902.Design of Fixed Steel Jackets.DISDraft[S].International Standardization Organization,2004
[5]ISO/DIS 13822.Bases for Design of Structures-As-sessment of Existing Structures[S].InternationalStandardization Organization,2000
[6]O’Connor P E,Versowsky P,Day M,et al.Plat-form assessment:recent section 17 updates and futureAPI/industry developments[A].Proceedings of Off-shore Technology Conference[C].Houston:OffshoreTechnology Conference,2005.17699
[7]PPCON.Reassessment of Structures[S].InternalGuideline for the Phillips Petroleum Company Nor-way,1998
[8]Perez F,Lopez A,Barrera P,et al.Experience in re-qualification of offshore platforms installed in the bayof Campeche[A].Proceedings of Offshore Technolo-gy Conference[C].Houston:Offshore TechnologyConference,2000.11936
[9]Madsen H O,Sorensen J D.Optimal inspection plan-ning for fatigue damage of offshore structures[A].Proceedings ICOSSAR 89[C].1989.2099-2106
[10]Moan T,Johannesen J M,V a。rdal O T.Probabilisticinspection planning of jacket structures[A].Proceed-ings of Offshore Technology Conference[C].Hous-ton:Offshore Technology Conference,1999.10848
[11]Pedersen C,Nielsen J A.Reliability based inspectionplanning for the Tyra field[A].Proceedings of 11thIn-ternational Conference on Offshore Mechanics andArctic Engineering[C].Alberta(Canada):ASME,1992.255-263
[12]Shetty N K,Gierlinske J T,Smith J K,et al.Struc-tural system reliability considerations in fatigue in-spection planning[A].Proceedings of Eighth Interna-tional Conference on the Behaviour of Offshore Struc-tures[C].Delft(Netherlands):Elsevier,1997.3:161-175
[13]Saul F,Oscar V.Optimal inspection schedulingmethodology for fixed offshore structures based on re-liability analysis[A].Proceedings of 17thInternationalConference on Offshore Mechanics and Arctic Engi-neering[C].Lisbon(Portugal):ASME,1998.1212
[14]DeFranco S,O'Connor P,Tallin A.Development of arisk based underwater inspection(RBUI)process forprioritizing inspections of large numbers of platforms[A].Proceedings of Offshore Technology Conference[C].Houston:Offshore Technology Conference,1999.10846
[15]Boom H V,Koning J,Aalberts P.Offshore monitor-ing;real world data for design,engineering and oper-ation[A].Proceedings of Offshore Technology Con-ference[C].Houston:Offshore Technology Confer-ence,2005.17172
[16]Brown A,Nicholas C,Driver D.Real-time full-pro-file current measurements for exploration and produc-tion structures in ultra deepwater[A].Proceedings ofOffshore Technology Conference[C].Houston:Off-shore Technology Conference,2005.17439
[17]Finnigan T D,Petrauskas C.Wave-in deck forces[A].Proceedings of 6thInt.Offshore and Polar En-grg.Conf.[C].Honolulu:International Society ofOffshore and Polar Engineers,1997.3:19-24
[18]Bea R G,Xu T,Stear J,et al.Wave forces on decksof offshore platforms[J].J.of Waterway,Port,Coastal and Ocean Engineering,1999,125(3):136-144
[19]Bea R G.Nonlinear performance of offshore platformsin extreme storm waves[J].J.of Waterway,Port,Coastal and Ocean Engineering,1996,122(2):68-74
[20]Stansberg C T,Baarholm R,Kristiansen T,et al.Extreme wave amplification and impact loads on off-shore structures[A].Proceedings of Offshore Tech-nology Conference[C].Houston:Offshore Technolo-gy Conference,2005.17487
[21]Boote D,Mascia D,Cafferena R.Seismic behaviourof fixed offshore platforms[A].Proceedings of 17thInternational Conference on Offshore Mechanics andArctic Engineering[C].Lisbon(Portugal):ASME,1998.0332
[22]Naggar M H,Shayanfar M A,Kimiaei M,et al.Sim-plified BNWF model for nonlinear seismic responseanalysis of offshore piles with nonlinear input groundmotion analysis[J].Canadian Geotechnical Journal,2005,(42):365-380
[23]Peng B F,Chang B,Llorente C.Nonlinear dynamicsoil-pile-structure interaction analysis of a deepwaterplatform for ductility level earthquakes[A].Proceed-ings of Offshore Technology Conference[C].Hous-ton:Offshore Technology Conference,2005.17274
[24]Johnson G S,Smith C E.Seismic evaluation of top-sides systems on existing platforms[A].Proceedingsof Offshore Technology Conference[C].Houston:Offshore Technology Conference,1997.8424
[25]欧进萍,段忠东,肖仪清.海洋平台结构安全评价:理论、方法和应用[M].北京:科学出版社,2003Ou J P,Duan Z D,Xiao Y Q.Safety Evaluation forOffshore Platform Structures:Thoery,Method andApplication[M].Beijing:Science Press,2003
[26]Chew S P,Soh C K.SCF design equations for steelmultiplanar tubular XT-joints[J].The StructuralEngineer,1996,74(13):215-221
[27]Ha C C,Pecknold D A.FE modeling of DT tubularjoints with chord stress[A].Proceedings of 17thInter-national Conference on Offshore Mechanics and ArcticEngineering[C].Lisbon(Portugal):ASME,1998.0560
[28]Morin G,Bureau J M,Contat N,et al.Influence oftubular joints failure modes on jacket structures globalfailure modes[A].Proceedings of 17thInternationalConference on Offshore Mechanics and Arctic Engi-neering[C].Lisbon(Portugal):ASME,1998.1482
[29]Karamanos S A,Romeijin,Wadenier J.Stress con-centration factors for the fatigue design of multi-pla-nar welded tubular connections[A].Proceedings ofEighth International Conference on the Behaviour ofOffshore Structures[C].Delft(Netherlands):Elsevi-er,1997.3:63-76
[30]陈传尧.疲劳与断裂[M].武汉:华中科技大学出版社,2002Chen C Y.Fatigue and Fracture[M].Wuhan:Huazhong University of Science and TechnologyPress,2002
[31]蒋习民,崔健,张衍涛.埕北25A平台结构疲劳寿命评估[J].中国海洋平台,2001,16(5):38-41Jiang X M,Cui J,Zhang Y T.Evaluation on fatiguelife for Chengbei 25A platform[J].China OffshorePlatform,2001,16(5):38-41
[32]Melchers R E.Modeling of marine corrosion of steelspecimens.Corrosion Testing in Natural Waters[M].Philadelphia:ASTM STP 1300,1997.2:20-33
[33]Ahammed M,Melchers R E.Reliability estimation ofpressurized pipelines subject to localized corrosion de-fects[J].International Journal Pressure Vessels andPiping,1996,69(3):267-272
[34]徐纪林,薛以年,李禾.随机变幅荷载下焊接接头的海水腐蚀疲劳裂纹扩展试验[J].中国海洋平台,1994,(1):143-147Xu J L,Xue Y N,Li H.Experiments on fatiguecrack extending for welding joints due to sea watercorrosion under random loading[J].China OffshorePlatform,1994,(1):143-147
[35]Soreide T H,Amdahl J.UFSOS-a program for ulti-mate strength analysis of framed offshore structures[R].Stavanger(Norway):SINTEF Structural Engi-neering,1986,Report STF71 A86049
[36]Skallerud B,Amdahl J.Nonlinear Analysis of Off-shore Structures[M].England:Research StudiesPress Ltd.,2002
[37]Ang A H S,Tang W H.Probability Concepts in En-gineering Planning and Design,Volume I-Basic Prin-ciples[M].New York:John Wiley and Sons,1975
[38]Ang A H S,Tang W H.Probability Concepts in En-gineering Planning and Design,volume II-Decision,Risk,and Reliability[M].New York:John Wiley andSons,1984
[39]董聪.结构系统可靠性理论:进展与回顾[J].工程力学,2001,18(4):79-88Dong C.Reliability theory of structural system:ad-vance and review[J].Engineering Mechanics,2001,18(4):79-88
[40]Onoufriou T,Smith D,Birkinshaw M,et al.Struc-tural system reliability framework for fixed offshoreplatforms[A].Proceedings of Eighth InternationalConference on the Behaviour of Offshore Structures[C].Delft(Netherlands):Elsevier,1997.3:145-159
[41]Bea R G.Reliability characteristics of a platform inthe Mississippi river delta[J].Journal of Geotechnicaland Geoenvironmental Engineering,1998,124(8):729-738
[42]Bea R G.Criteria for design and requalification ofplatforms in the bay of Campeche,Mexico[J].J.ofWaterway,Port,Coastal and Ocean Engineering,2000,126(5):254-262
[43]Bea R G.Life cycle reliability&risk characteristics ofminimum structures[A].Proceedings of OffshoreTechnology Conference[C].Houston:Offshore Tech-nology Conference,1997.8361
[44]Marley M,Etterdal B,Etterdal B,et al.Structuralreliability assessment of Ekofisk jackets under ex-treme loading[A].Proceedings of Offshore Technolo-gy Conference[C].Houston:Offshore TechnologyConference,2001.13190
[45]金伟良,郑忠双,李海波.地震荷载作用下海洋平台结构物动力可靠性分析[J].浙江大学学报,2002,36(3):233-238Jin W L,Zheng Z S,Li HB.Analysis of dynamic re-liability of offshore jacket platforms subjected to seis-mic action[J].Journal of Zhejiang University,2002,36(3):233-238
[46]Bea R G.Reliability based earthquake design guide-lines for marine structures[J].J.of Waterway,Port,Coastal and Ocean Engineering,1999,125(5):219-231
[47]Gusella V.Safety estimation method for structureswith cumulative damage[J].Journal of EngineeringMechanics,1998,124(11):1200-1209
[48]Valle C.Effect of strain rate,sampling technique andaging on the soil properties used in the reassessmentof pile foundations performance in the bay ofCampeche[A].Proceedings of Ocean TechnologyConference[C].Houston:Offshore Technology Con-ference,1998.8822
[49]Bea R G.Evaluation of reliability of platform pilefoundations[J].Journal of Geotechnical and Geoenvi-ronmental Engineering,1999,125(8):696-704
[50]Akgul F,Frangopol D M.Computational platform forpredicting lifetime system reliability profiles for differ-ent structure types[J].Journal of Computing in CivilEngineering,2004,18(2):92-104
[51]Wirsching P H.Fatigue reliability for offshore struc-tures[J].J Strut Eng,1984,100(10):2340-2356
[52]倪侃,高镇同.疲劳可靠性二维Miner准则[J].固体力学学报,1996,17(4):365-371Ni K,Gao Z T.Two-dimensional probabilisticMiner’s rule in fatigue reliability[J].Acta MechanicaSolida Sinica,1996,17(4):365-371
[53]Vardal O T,Moan T,Hellevig N C.Comparison be-tween observed and predicted characteristics of fatiguecracks in North Sea jackets[A].Proceedings of Off-shore Technology Conference[C].Houston:OffshoreTechnology Conference,1999.10847
[54]吕海波,姚卫星.结构系统疲劳可靠性评估方法的研究[J].南京航空航天大学学报,1999,31(3):294-299LüH B,Yao W X.A new method of fatigue reliabili-ty estimation for structural system[J].Journal ofNanjing University of Aeronautics&Astronautics,1999,31(3):294-299
[55]叶乃全,胡毓仁,陈伯真.超静定结构系统疲劳可靠性分析的蒙特卡罗方法[J].上海交通大学学报,1998,32(11):8-12Ye N Q,Hu Y R,Chen B Z.Fatigue analysis of re-dundant structural systems by using Monte Carlo sim-ulation[J].Journal of Shanghai Jiaotong University,1998,32(11):8-12
[56]董聪,何庆芝.随机疲劳累积损伤可靠性分析模型[J].北京航空航天大学学报,1995,21(2):33-39Dong C,He Q Z.A reliability analysis model of ran-dom fatigue cumulative damage[J].Journal of BeijingUniversity of Aeronautics&Astronautics,1995,21(2):33-39
[57]Byers W G,Marley M J,Mohamadi J,et al.Fatiguereliability reassessment applications:State of the artpaper[J].Journal of Structural Engineering,1997,123(3):277-285
[58]方华灿,陈国明.海洋平台结构整体疲劳寿命的预测[J].石油矿场机械,2000,29(5):1-5Fang H C,Chen G M.The fatigue life prediction ofwhole structure of offshore platform[J].Oil Field E-quipment,2000,29(5):1-5
[59]方华灿,吴小薇.海洋石油平台结构系统的疲劳寿命预测[J].机械强度,2002,24(1):101-103Fang H C,Wu X W.Fatigue life prediction of struc-ture system of offshore oil platform[J].Journal ofMechanical Strength,2002,24(1):101-103
[60]张立,金伟良.海洋平台结构疲劳损伤与寿命预测方法[J].浙江大学学报(工学版),2002,36(2):138-142Zhang L,Jin W L.Prediction approaches to struc-tural fatigue damage and life of offshore engineering[J].Journal of Zhejiang University(Engineering Sci-ence),2002,36(2):138-142
[61]Karamchandani A,Dalane J I,Bjerager P.Systemsreliability of offshore structures including fatigue andextreme wave loading[J].Marine Structures,1991,4:353-379
[62]赵维涛,安伟光,严心池.同时考虑结构系统强度和疲劳的可靠性分析[J].哈尔滨工程大学学报,2004,25(5):614-617Zhao W T,An W G,Yan X C.Reliability analysis ofstructural system considering strength and fatigue[J].Journal of Harbin Engineering University,2004,25(5):614-617
[63]Haddon J W.The basic strategies for reducing damagefrom hazards of all kinds[J].Hazard Prevention,1980,(3):8-12
[64]Ersdal G.Assessment of existing offshore structuresfor life extension[D].Stavanger(Norway):Univer-sity of Stavanger,2005
[65]Skjong R,Ronold K O.Societal indicators and riskacceptance[A].Proceedings of 17thInternational Con-ference on Offshore Mechanics and Arctic Engineering[C].Lisbon(Portugal):ASME,1998.1488
[66]Aven T.Foundation of Risk Analysis,a Knowledgeand Decision-oriented Perspective[M].West Sussex,England:John Wiley and Sons Ltd.,2003
[67]Ganguly P,Goldberg L.The Pompano subsea inspec-ton[A].Proceedings of Offshore Technology Confer-ence[C].Houston:Offshore Technology Conference,1997.8469
[68]Etterdal B,Askheim D,Grigorian H,et al.Strength-ening of offshore steel components using high-strength grout:component testing and analyticalmethods[A].Proceedings of Offshore TechnologyConference[C].Houston:Offshore Technology Con-ference,2001.13192
[69]Silva L,Carroll B,Olsen T,et al.Testing of a newgrouted joint for offshore platforms[A].Proceedingsof Offshore Technology Conference[C].Houston:Offshore Technology Conference,1998.8829
[70]Souza M,Bayazitoglu Y,Lu L S,et al.Repairs ofhurricane damaged platforms in the bay of Campeche[A].Proceedings of Offshore Technology Conference[C].Houston:Offshore Technology Conference,1998.8694
[71]Daniel K P,Puskar F J,Couch J,et al.Repair of agulf of Mexico platform using API RP 2A section 17Guidelines and multiple underwater repair techniques[A].Proceedings of Offshore Technology Conference[C].Houston:Offshore Technology Conference,1998.8734