风火山冻土隧道爆破技术研究
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
以青藏高原风火山隧道常年冻土(岩)爆破技术为研究对象,运用理论分析、试验研究、数值模拟和现场测试等方法,对冻土爆破技术进行了系统研究.通过对隧道数值模拟发现隧道轮廓顶部震动速度最大,温度变化比较明显.分析了影响冻土热平衡的外部热源因素,并完成了NaCl水溶液降低爆生气体温度试验,在周边炮眼采用盐水炮泥解决了爆生产物热源问题;针对隧道围岩性质,提出了不同围岩条件下开挖方案,最后对隧道爆破振动进行了监测.
The blasting technology for perennial frozen soil of the Fenghuoshan tunnel in Qingzang Plateau wias researched.The research methods include theory analysis, experimentation, numerical simulation and field test. The results of numerical simulation indicate that the vibration velocity is the highest and the temperature variation is rather clear on the tunnel top. The exterior thermal resources that influence the heat balance of frozen soil was analyzed and then the test about NaCl saline water decreasing the high temperature due to explosion was performed. The problem from heat sources of the explosion product was settled by filling NaCl saline water stemming into bores. Aiming at the tunnel wall rock character, corresponding digging project was put forward. At last, the blast vibration of the tunnel was monitored.
引文
[1]崔托维奇H A.冻土力学[M ].张长庆,朱元林,译.北京:科学出版社,1985.
    [2]马租罗夫ΓΠ.冻土物理力学性质[M ].梁惠生,伍期建,译.北京:煤炭工业出版社,1980.
    [3]顾毅成,冯叔瑜.高原冻土地区路堑爆破开挖施工的基本原则[ J].中国铁道科学,2001,22(6):95~99.
    [4]何广沂.青藏高原多年冻土地带爆破研究[ J].中国工程科学,2001,3(6):57~64.
    [5]杨年华.冻土爆破的实践与认识[ J].铁道工程学报,2000,68(4):95~97.
    [6]杨小林,王树仁.岩石爆破损伤及数值模拟[ J].煤炭学报,2000,25(1):18~23.
    [7]杨小林,王梦恕,王树仁.爆破对岩体基本质量影响及试验研究[ J].岩土工程学报,2000,22(4):461~464.
    [8]郭学彬,肖正学,张志呈,等.爆破地震波的频谱特性研究[ J].化工矿物与加工,1999(7):18~20.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心