基于能力谱法原理的改进模态静力弹塑性分析
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
模态静力弹塑性分析法中,动力时程分析部分的可操作性较差,且分析结果不稳定。用能力谱法替代原有的动力时程分析,在现行规范加速度反应谱基础上计算结构各振型等效单自由度体系各性能水平的位移反应,然后将其转化为相应多自由度结构的位移反应,并通过平方和开方法求得结构的总位移反应,用其与结构某一性能水平的位移(层间位移角)限值进行比较,判断设计结果是否满足性能目标要求。该方法改善了模态静力弹塑性分析法的可操作性,使其评估结果更加稳定。
In the procedure of modal pushover analysis,non-linear time-history analysis is not so operative and its analytical result is unstable,the capacity-spectrum theory is used to take the place of dynamic time-history anslysis.Converting the acceleration response spectrum of current code into displacement response spectrum,the displacement response of equivalent single degree of freedom in each mode of vibration can be calculated by capacity spectrum method.Then the displacement response of multi-degree of freedom can be obtained too,and it is used to compare with the corresponding displacement(storey drift ratio) limits,judging whether the structure satisfies its performance objective or not.The proposed method improves the modal pushover analysis’operation and stability.
引文
[1]GB 50011—2001建筑抗震设计规范[S].
    [2]GB 50011—2010建筑抗震设计规范[S].
    [3]王亚勇,戴国莹.建筑抗震设计规范算例[M].北京:中国建筑工业出版社,2006.
    [4]Gupta B,Kunnath S K.Adaptive Spectra-Based PushoverProcedure for Seismic Evaluation of Structures[J].EarthquakeSpectra,2000,16(2):367-391.
    [5]Jan Tysh-Shang,Liu Ming Wei.An Upper-Bound PushoverAnalysis Procedure for Estimating the Seismic Demands of High-Rise Building[J].Engineering Structures,2004,26:117-128.
    [6]Chopra A K,Goel R.A Model Pushover Analysis Procedure forEstimating Seismic Demands for Building[J].EarthquakeEngineering and Structural Dynamics,2002,31(1):561-582.
    [7]侯爽,欧进萍.结构pushover分析的侧向力分布及高阶振型影响[J].地震工程与工程振动,2004,24(3):90-97.
    [8]卢文生,吕西林.框架剪力墙结构模态静力非线性抗震分析方法研究[J].地震工程与工程振动,2005,25(1):58-66.
    [9]Shibata A,Sozen M.Substitute Structure Method for SeismicDesign in RC[J].Journal of the Structure Divison,ASCE,1976,102(1):1-18.
    [10]刘有军,周建民.基于位移的RC框架结构抗震设计研究[J].结构工程师,2003(3):1-6.
    [11]梁兴文,黄雅捷.钢筋混凝土框架结构基于位移的抗震设计方法研究[J].土木工程学报,2005,38(9):53-60.
    [12]Filiatrault A,Folz B.Performance-Based Seismic Deisgn of WoodFramed Building[J].Journal of Structural Engineering,2002,128(1):39-47.
    [13]Miranda E,Garcia J G.Evaluation of Approximate Methods to Estimate Maximum Inelastic Displacement Demands[J].Earthquake Engineering and Structural Dynamics,2002,31:539-560.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心