摘要
通过对厦门地铁2号线二期工程翁马区间矿山法隧道过高压富水断层的对策分析、实施和总结,为隧道工程通过类似的断层提供了成功经验。
Through the countermeasure analysis,implementation and summary of over-high pressure and water-rich faults in Wengma tunnel of Xiamen Metro Line 2 Phase Ⅱ Project,this paper provides successful experience for tunnel engineering to pass through similar faults.