某沿海滩涂风电场PHC桩沉桩问题研究
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:Research on PHC Pile Driving in a Coastal Shoal Wind Farm
  • 作者:黄万山 ; 朱岩 ; 彭秀芳 ; 吉春明 ; 李素良
  • 英文作者:HUANG Wan-shan;ZHU Yan;PENG Xiu-fang;JI Chun-ming;LI Su-liang;Jiangsu Power Design Institute Co., Ltd. of CEEC;
  • 关键词:滩涂风电场 ; PHC桩 ; 抗压 ; 抗拔 ; 沉桩 ; 单节桩
  • 英文关键词:shoal wind farm;;PHC pile;;compression resistance;;uplift resistance;;pile driving;;single segment pile
  • 中文刊名:电力勘测设计
  • 英文刊名:Electric Power Survey & Design
  • 机构:中国能源建设集团江苏省电力设计院有限公司;
  • 出版日期:2019-03-31
  • 出版单位:电力勘测设计
  • 年:2019
  • 期:03
  • 语种:中文;
  • 页:74-79
  • 页数:6
  • CN:11-4908/TK
  • ISSN:1671-9913
  • 分类号:TM614;TU473.1
摘要
文章阐述了某沿海滩涂风电场项目风机PHC桩基础的设计方案,并对单桩抗压、抗拔承载力进行了验算,计算结果表明,单桩抗压、抗拔承载力满足要求。针对PHC桩沉桩过程中遇到的问题,提出了处理方案,包括补PHC桩、补灌注桩、加强填芯。详细分析了处理方案的合理性,补桩偏向承台一侧造成群桩形心偏移引起群桩的内力重分布,并对单桩抗压、抗拔承载力重新进行了验算,结果表明,单桩抗压、抗拔承载力仍满足要求。同时,文章还提出了在桩基持力层选择3-2层粉砂层条件下,采用单节桩、增加桩数的处理方案,实践表明该方案有一定可行性,但需注意其适用条件。
        This article expounds the design scheme on PHC pile foundation of wind turbine in a coastal shoal wind farm. The compressive and uplift capacity of single pile has been checked and the calculation results show that they meet the requirements of relevant standards. Aiming at solving the problems during pile driving, some treatment schemes have been put forward, including increasing PHC pile and cast-in-situ pile, and enhancing core filling. This article analyzes both the rationality of the treatment schemes in detail and the redistribution of internal forces of pile group which is caused by the centroid offset due to the supplementary piles have deflected to one side of the pile cap.Compressive and uplift capacity of single pile has been checked and meets the requirements as before. Meanwhile,under the condition of choosing 3-2 silty sand layer as the bearing layer, the scheme of adopting single segment pile and increasing the number of piles has been proposed. The practice shows that the scheme is feasible to some extent and the applicable condition should be paid attention to.
引文
[1]孙亚哲,等.PHC桩穿越深厚密实砂层可打性分析及现场试验研究[J].工程地质学报,2015,23(6):1079-1084.
    [2]张慧旭.PHC桩穿越较厚中密砂夹层的施工技术研究[J].江苏建筑,2010(2):71-72,94.
    [3]胡东,黄松涛.PHC桩在沉桩过程中出现纵向裂缝的原因分析及相应对策[J].水运工程,2011(5):141-146.
    [4]汤红军,张虎,金来建.南昌某预应力管桩沉桩问题及处理[J].建筑结构,2017,47(增刊):1082-1084.
    [5]陈亮.桩端加环对PHC桩影响的试验研究[J].岩土工程技术,2011,25(1):5-9.
    [6]JGJ 94-2008,建筑桩基技术规范[S].
    [7]FD 003-2007,风电机组地基基础设计规定(试行)[S].