斜沟煤矿18201工作面采动对+700 m水平南翼3条大巷破坏严重。因此,对18201工作面材料巷实施了切顶卸压技术,根据材料巷顶底板岩性,确定了合理的切顶卸压孔长度及钻孔间距;并利用FLAC3D数值软件模拟对比了切顶及不切顶条件下,辅运大巷的应力分布情况,对+700 m南翼辅运大巷两帮移近量的观测结果表明,该切顶卸压护巷方案较为合理。
The mining of 18201 working face in Xiegou coal mine seriously damaged 3 roadways of the south wing at +700 m horizontal level. Therefore, the roof-cutting pressure relief technology was applied to the roadway of 18201 working face. The reasonable length and spacing of the drilling holes for roof-cutting and pressure relief were determined according to the lithology of the roadway, FLAC3 D numerical software was introduced for stress distribution comparison under the condition of before and after the roof-cutting. Observation shows that the scheme for roof-cutting and pressure relief is more feasible.
引文
[1] 汤朝均,盛建发.切顶卸压护巷技术研究与应[J].煤炭技术,2015, 34(8):78-81.
[2] 王玉杰.构造破碎区沿空掘巷偏应力分布特征与控制技术[J].采矿与安全工程学报,2017,34(1):24-31.
[3] 徐刚,刘金明.沿空留巷巷旁控制技术及其适用条件分析[J].煤炭科学技术,2016,44(4):27-33.
[4] 傅菊根.大采高沿空留巷巷旁复合承载结构的稳定性分析[J].岩土工程学报,2014,36(5):969-976.