本文对桩承加筋土复合地基的工程应用发展和研究情况进行了回顾,并对作用机理、理论计算方法以及设计方法进行了总结归纳,通过模型试验对循环荷载下桩承加筋土复合地基性状进行了研究。
     进行加载波形为矩形的循环荷载下桩承加筋土复合地基模型试验,研究了加载波形为矩形循环荷载作用下桩承加筋土复合地基的沉降发展情况,并得出了可用于估算后续循环荷载作用下复合地基沉降的计算经验公式;分析了峰值荷载、周期对沉降、桩土应力比、桩身轴力和土工格栅张拉力的影响,得出了沉降、桩土应力比、桩身轴力和土工格栅张拉力随这些参数的变化规律。
     进行加载波形为三角形的循环荷载下桩承加筋土复合地基模型试验,研究了加载波形为三角形循环荷载作用下桩承加筋土复合地基的沉降发展情况,并得出了可用于估算后续循环荷载作用下复合地基沉降的计算经验公式;分析了垫层厚度、桩帽大小、桩间距、土工格栅层数及桩土刚度比对沉降、桩土应力比、桩身轴力和土工格栅张拉力的影响,得出了沉降、桩土应力比和桩身轴力随这些参数的变化规律。
This paper has summarized the improvement of project application and research situation of geogrid-reinforced and pile-supported composite foundation, generalized the mechanism of action,theoretical calculation methods and design methods. And its behavior is studied by model text under cyclic loading.
     It has studied the settlement characteristics of the geogrid-reinforced and pile-supported foundation under cyclic loading of rectangular. and obtained a empirical formula to estimate the settlement of composite foundation under follow-up cyclic loading of rectangular. By analyzing the effects that peak load,cycle on the settlement, the stress ratio of the pile to the soil, pile axial force, the tension of geogrid of the geogrid-reinforced and pile-supported foundation, it is indicated the variation rule of the settlement, the stress ratio of the pile to the soil , pile axial force, the tension of geogrid with the variation of these parameters.
     It has studied the settlement characteristics of the geogrid-reinforced and pile-supported foundation under cyclic loading of triangle. and obtained a empirical formula to estimate the settlement of composite foundation under follow-up cyclic loading of triangle. By analyzing the effects that cushion thickness,the size of pile cap ,pile spacing, geogrid layers , the stiffness ratio of the pile to the soil on the settlement , the stress ratio of the pile to the soil , pile axial force, the tension of geogrid of the geogrid-reinforced and pile-supported foundation, it is indicated the variation rule of the settlement , the stress ratio of the pile to the soil , pile axial force, the tension of geogrid with the variation of these parameters.
引文
[1]陈红萍,李强,李树云.桩承土工格网垫层在软基处理中的应用.湖南交通科技,16(2):15-16,2000.
    [2]饶为国.桩-网复合地基沉降机理及设计方法研究.博士学位论文,北方交通大学,北京,2002.4.
    [3]饶为国,江辉煌,候庆华.桩-网复合地基工后沉降的薄板理论解.水利学报,(4):23-27,2002.4.
    [4]饶为国,江辉煌,邓安雄.桩-网路基工后沉降的实时预测.北京交通管理干部学院学报,11(1):10-16,2001.
    [5]饶为国,江辉煌,尤昌龙.桩-网复合地基工后沉降量的三维推算法.岩土工程界,4(8):55-57,2001.
    [6]陈宏友,李彬.桩承土工合成材料复合地基在潭邵告诉公路软基处理中的应用.中南公路工程,27(1):40-44,2002.3.
    [7]姜燕玲.粉喷桩与土工格栅联合加固技术理论研究与计算.硕士学位论文,山东大学,济南,2003.3.
    [8]张建勋,陈福全,简红钰.桩承土工织物加筋地基的研究与工程应用综述.福建工程学院学报,1(3):10-15,2003.9.
    [9]赵刚,欧阳仲春.桩承加筋土垫层复合地基的原理与计算.城市道桥与防洪,(5):118-121,2004.9.
    [10]鲁长亮,黄生文,朱树彬.桩承土工加筋地基桩土应力比计算及其优化设计.西部探矿工程,(5):43-45,2005.5.
    [11]晏莉,阳军生,韩杰.桩承土工合成材料加筋垫层复合地基作用原理及应用.岩土力学,26(5):821-826,2005.5.
    [12]朱自强.桩承加筋土复合地基的理论与应用分析.硕士学位论文,浙江大学,杭州,2006.
    [13]张超.桩承加筋土复合地基的模型试验研究.硕士学位论文,浙江大学,杭州,2007.
    [14]胡立科.桩承加筋土复合地基性状试验研究与有限元分析.硕士学位论文,浙江大学,杭州,2008
    [15]J.Han and M.A.Gabr.Numerical analysis of geosynthetic-reinforced and pile-supported earth platforms over soft soil.Journal of Geotechnical and Geoenvironmental Engineering,page 44-53,2002.1.
    [16]C.J.F.P.Jones,C.R.Lawson,D.J.Ayres.Geotexile reinforced piled embankment.Geotextile,Geomembranes and Relaxed Products,Denhoedt(ed.),1990,Balkema,Rotterdam,IsBN90: 155-160.
    [17]Tsukada,Y.,Isoda,T.,and Yamanouchi,T.Geogrid subgrade reinforcement and deep foundation improvement.Proc.,Geosynthetics Case Histories,Int.Society for Soil Mechanics and Foundation Engineering,Committee TC9,Yono City,Japan,158-159,1993.
    [18]Rathmayer,H.Piled embankment supported by single pile caps.Proc.,Conf.on Soil Mechanics and Foundation Engineering,Istanbul,283-290,1975.
    [19]Vernon R.Schaefer,Lee W.Abramson,Joe C.Drumheller,and Kevan D.Sharp,editors.Ground Improvement Ground Reinforcement and Ground Treatment,number 69 in Geotechnical Special Publication,Logan,1997.Geo-Logan '97 Conference,ASCE.
    [20]Alzamora D.E.,Wayne M.H.,and Han J.Performance of SRW supported by geogrids and jet grout columns.In John Derrick,Eerke Boiten,Jim Woodcock,and Joakim yon Wright,editors,Performance Confirmation of Constructed Geotechnical Facilities,number 19 in Geotechnical Special Pubilcation,pages 456-466.ASCE,2000.
    [21]J.Han and K.Akins,Case studies of geogrid-reinforced and pile-supported earth structures on weak foundation soils.In O'Neill and Towsend,editors,Proceeding of International Deep Foundation Congress,number 116 in Geotechnical Special Publication,pages 668-679,Orlando,ASCE,2002.
    [22]龚晓南.复合地基.浙江大学出版社,杭州,1992.
    [23]郑忠勤,谭祖保,胡汉忠.用粉喷桩土工格网加固永丰营车站深层软土路基的施工技术.路基工程,(3):58-61,2000.
    [24]连峰.桩网复合地基承载机理及设计方法.博士学位论文,浙江大学,杭州,2009.4.
    [25]Jones C J,Lawson CR,and Ayres DJ.Geotextile reinforced piled embankment.In Geotextile Gemembranes and Related Products,pages 155-159,balkema,rotterdam,1990.
    [26]British Standard 8006.Code of Practice for strengthened/reinforced soils and other fills,British Standards Institute,1995.
    [27]Guido V.A.,Biesaidechi G.L.,and Sullivan M.J.,Bearing capacity of ageotextile reinforced foundation," Proceedings,11th International Conference on Soil Mechanics and Foundation Engineering,San Francisco,3,1777-1780.,1985.
    [28]Schmertmann,J.H.,A new,empirically based,arching theory and method for the design loading of a geogrid supporting overburden and spanning a void.Schmertmann & Crapps,Inc.,1991.10.
    [29]Miki,H.,Design of deep mixing method of stabilization with low improvement ratio,The First Seminar on Ground Improvement in Highways,Bangkok,Thailand,1997.8.
    [30]Hewlett,W.J.and Randolph,M.F.(1988)."Analysis of piled embankments." Ground Engineering,21(3),12-18.
    [31]Giroud,J.P.,and Noiray,L.,Geotextile-reinforced unpaved road design,Journal of Geotechnical and Geoenvironmental Engineering,107(9),1233-1254.,ASCE,1981.
    [32]Giroud,J.P.,Ah-Line,C.,and Bonaparte,R.,Design of unpaved roads and trafficked areas with geogrids.,Polymer grid reinforcement,Thomas Telford Limited,London,116-127.,1985.
    [33]Giroud,J.P.and Han,J.,Design method for geogrid-reinforced unpaved roads -Part Ⅰ:theoretical development.,Journal of Geotechnical and Geoenvironmental Engineering,130(8),776-786.,ASCE,2004.
    [34]Giroud,J.P.and Han,J.,Design method for geogrid-reinforced unpaved roads -Part Ⅱ:calibration and verification.,Journal of Geotechnical and Geoenvironmental Engineering,130(8),787-797.ASCE,2004.
    [35]Svan(?),G.,Ilstad,T.,Eiksund,G.,and Want,A.,Alternative calculation principle for design of piled embankments with base reinforcement.,Proc.4th International Conference on Ground Improvement Geosystems,Helsinki,2000.6.
    [36]Card,G.B.and Carter,G.R.,Case history of a piled embankment in London's Docklands.,Engineering Geology of Construction,Geological Society Engineering Geology Special Publication,10,79-84,1995.
    [37]Yvonne Rogbeck et.,Nordic Guidelines for Reinforced Soils and Fills,Nordic Geosynthetic Group,2003.5.
    [38]李强,桩承土工格网复合地基处治机理与设计方法研究,长沙交通学院硕士学位论文,2003.6.
    [39]李强,郑健龙.桩承土工格网褥垫层的承载特性与设计计算.公路,(5):6-9,2005.5.
    [40]鲁长亮,黄生文,朱树彬.桩承土工加筋地基桩土应力比计算及其优化设计.西部探矿工程,(5):43--45,2005.5.
    [41]David Whyte,The Overriding Aspects of The Design of Geosynthetic-Reinforced Pile Supported Embankment,Foundation Engineering,ASCE,2005.
    [42]J.G.Collin,NHI Ground Improvement manual - Technical Summary #10:Column Supported Embankments,2003.
    [43]J.G.Collin,Column Supported Embankment Design Considerations.Proc.University of Minnesota 52nd Annual geotechnical Engineering Conference,Minneapolis,Minnesota.,2004.
    [44]J.G.Collin,C.H.Watson,and J.Han,Column-Supported Embankment Solves Time Constraint for New Road Construction,Foundation Engineering,ASCE,2005.
    [45]施有志,桩承土工合成材料加筋垫层复合地基承载力的计算方法,工程勘查,2006年第7期.
    [46]陈娟,吴西臣.桩网复合地基桩土应力比的确定.水文地质工程地质,(3):116-119,2007.
    [47]郑俊杰,陈保国,Sari W,Abusharar,王仙芝.双向增强体复合地基桩土应力比分析,华中科技大学学报(自然科学版),35(7):110-113,2007.7.
    [48]Ohkubo,T.,Asada,S.,and Karube,D.,A study on the reinforcing effects of geogrids over laid on pile group for the embankment foundations,Earth Reinforcement,Balkema,Rotterdam,pp.641-646.1996.
    [49]H.B.Poorooshasb,M.Alamgir and N.Miura,Negative Skin Friction on Rigid and Deformable Piles,Computers and Geotechnics,Vol.18,No.2,pp.109-126,ELSEVIER,1996.
    [50]Sa,C.T.,Palmeira,E.M.,Dellabianca,L.M.A.,and Fahel,A.R.S.(2001)."Numerical analysis of reinforced embankments on soft soils".Landmarks in Earth Reinforcement,Swets and Zeitlinger,pp.265-270.
    [51]David J.White et.,NUMERICAL ANALYSES OF GEOSYNTHETIC-REINFORCED RAMMED AGGREGATE PIER-SUPPORTED EMBANKMENTS,Iowa State University,Draft Report,2003.5.
    [52]Rutugandha Gangakhedkar,Geosynthetic Reinforced Pile Supported Embankments,A Thesis Presented to The Graduate School of The University of Florida in Partial Fulfillment of The Requirements for The Degree of Master of Engineering,2004.5
    [53]曹荣旭.桩承土工合成材料复合地基的数值模拟研究.山西建筑,30(8):33-34,2004.4.
    [54]孙文怀,董金玉,杨传喜,杨继红.桩承土工合成材料复合地基的研究.工程勘察,(6):7-9,2004.
    [55]晏莉,桩承土工合成材料加筋垫层复合地基作用机理数值分析,长沙理工大学硕士学位论文,2004.5
    [56]Miriam E.Stewart and George M.Filz,Influence of Clay Compressibility on Geosynthetic Loads in Bridging Layers for Column-Supported Embankments,Foundation Engineering,ASCE,2005.
    [57]Raja S.Madhyannapu et.Analysis of Geotextile Reinforced Embankment Over Deep Mixed Soil Columns,GeoCongress,ASCE,2006.
    [58]胡小军,郑澄峰.桩网复合地基工作性状有限元法分析.铁道勘察,(3):23-26,2007.
    [59]芮瑞,夏元友.桩—网复合地基与桩承式路堤的对比数值模拟.岩土工程学报,29(5):769-773,2007.
    [60]Bergado,D.T.,Long,P.V.,and Murthy,B.R.S.,A case study of geotextile-reinforced embankment on soft ground".Geotextiles and Geomembranes,Vol.20,pp.343-365.2002.
    [61]饶为国,桩-网新工法加固软土路基理论与技术,中国地震局地球物理研究所博士后研究工作报告,北京,2005.3.
    [62]马学宁,杨有海,梁波,土工格栅砂垫层与碎石桩复合地基承载试验研究,兰州交通大学学报(自然科学版),第24卷第4期,2005.8.
    [63]刘俊新,谢强,文江泉,邱恩喜.粉喷桩-土工格栅复合地基应力现场测试研究.岩土力学,28(2):376-380,2007.
    [64]Fereidoon Moghaddas-Nejad and John C.Small,Effect of Geogrid Reinforcement in Model Track Tests on Pavements,Journal of Transportation Engineering,ASCE,1996.
    [65]Aniruddha Gadre and Ricardo Dobry,Lateral Cyclic Loading Centrifuge Tests on Square Embedded Footing,Journal of Geotechnical and Geoenvironmental Engineering,ASCE,1998.11.
    [66]张兴强,阎澍旺,邓卫东,交通荷载作用下土工格栅加筋路基的弹塑性分析,振动工程学报,第14卷第3期,2001.9.
    [67]蒋军,循环荷载作用下粘土及砂芯复合试件性状试验研究,浙江大学博士学位论文,2000.3.
    [68]侯永峰,循环荷载作用下复合土与复合地基性状研究,浙江大学博士学位论文,2000.4.
    [69]梅英宝,交通荷载作用下道路与软土复合地基共同作用性状研究,浙江大学博士学位论文,2004.5.
    [70]胡立锋,交通荷载作用下软粘土复合路基的动力响应分析,浙江大学硕士学位论文,2005.2.
    [71]贾宁,软土地基高速公路拓宽的沉降性状及处理研究,浙江大学博士学位论文,2004.11.
    [72]陈仁朋,贾宁,陈云敏,桩承式加筋路堤受力机理及沉降分析,岩石力学与工程学报,Vol.24 No.23,2005.12.
    [73]J.Han.Design and construction of embankments on geosynthetic reinforced platforms supported by piles.Proceedings of 1999 ASCE/PaDOT Geotechnical Seminar,Central Pennsylvania Section,ASCE and Pennsylvania Department of Transportation,Hershey,PA,66-84,1999.
    [74]McNulty.An experimental study of arching in sand.Technical Report I-674,US Army Engineer Waterways Experiment Station,Corps of Engineers,Vicksburg,Miss.,1965.
    [75]Bonaparte,R.,and Berg,R.R.,The use of geosynthetics to support roadways over sinkhole prone areas,Karst Hydrogeology:Engineering and Environmental Applications,B.F.Beck and W.L.Wilson,eds.,A.A.Balkema,Rotterdam,437-445.1987.
    [76]Giroud,J.P.,Bonaparte,R.,Beech,J.F.,and Gross,B.A.,Design of soil layer-geosynthetic systems overlying voids,Geotextiles and Geomembrane,Elsevier,New York,9(1),11-50.1990.
    [77]Schmertmann,J.H.,Soil arching and the spanning of voids,Proc.,1999 ASCE/PaDot Geotechnical Seminar,Central Pennsylvania Section,ASCE and Pennsylvania Dept.of Transportation,Hershey,Pa.,15.,1999.
    [78]J.Han and M.A.Gabr,Numerical Analysis of Geosynthetic-Reinforced and Pile-Supported Earth Platforms over Soft Soil,JOURNAL OF GEOTECHNICAL AND GEOENVIRONMENTAL ENGINEERING,ASCE,2002.
    [79]J.Han,Development of Design Charts for Geosynthetically Reinforced Embankments on Deep Mixed Columns.Interim Report Ⅰ-Literature Review,submit to National Deep Mixing Cooperative Research Program,123p.2003.
    [80]饶卫国,赵成刚.桩-网复合地基应力比分析与计算.土木工程学报,35(2):74-80,2002.4.
    [81]陈娟,吴西臣.桩网复合地基桩土应力比的确定.水文地质工程地.第三期.2007.
    [82]Carlsson B.Reinforced soil principles for calculation.Linoping University,Terratema AB,Linoping,Sweden,1987.
    [83]Giroud JP,Bonaparte R,Beech HF,Gross BA.Design of soil layer-geosynthetic systems overlying voids.In Geotextiles and Geomembrane,11-50.Elsevier,Newwork,1990.
    [84]梅英宝.交通荷载下道路与软土复合地基共同作用性状研究.浙江大学博士学位论文。2004.5.
    [85]Matisui T,et al.Cyclic stress-strain history and shear characteristics of clay.J of Geotech Engrg.Div,ASCE,1980,106(10):1101-1120.
    [86]侯永峰.循环荷载作用下复合土与复合地基性状研究。杭州:浙江大学博士学位论文,2000.
    [87]陈善民.水泥搅拌桩复合地基的静、动力特性研究.杭州:浙江大学博士学位论文,2001.
    [88]沈伟,池跃君,宋二祥,考虑桩、土、垫层协同作用的刚性桩复合地基沉降计算方法,工程力学,2003.20(2).
    [89]许峰,陈仁朋,陈云敏,徐立新,桩承式路堤的工作性状分析,浙江大学学报(工学版),第39卷第9期,2005.9.