高压压气机研制项目风险管理研究
详细信息    本馆镜像全文|  推荐本文 |  |   获取CNKI官网全文
摘要
高压压气机研制项目风险管理研究
     工程项目是在复杂的自然和社会环境中进行的。在航空工业工程实践中,项目投资大,研制周期长,复杂程度高,参研单位在项目的各个阶段都面临着各种各样的风险,研制周期延长和经费超预算现象十分普遍。作为项目管理的重要组成部分,项目风险管理在确保项目目标的顺利实现中扮演着十分重要的角色:通过对项目实行风险管理,防患于未然或及时采取补救措施,将意外损失减低到最低程度。
     在航空工业中,航空发动机的研制工作极具代表性,研制周期长,技术难度大,涉及学科多,经费需求巨大,在项目研制过程中风险因素众多。因此项目风险管理对航空发动机研制工作具有重要意义。作为飞行器的主要动力装置,航空燃气轮机广泛用于各种用途的飞机,被誉为飞机的“心脏”。作为核心部件,高压压气机对于航空燃气轮机至关重要,其性能的优劣直接影响着整机性能,在航空燃气轮机研制中占有重要地位。一种形象的说法生动展现了高压压气机研制难度之大——“1台压气机试验需要测试的参数是相当于3台整机”,因此,高压压气机研制技术难度、风险极大。
     本文通过对高压压气机部件研制项目的风险进行了识别、评估和评价,建立了高压压气机研制项目风险分析监控指标及风险管理流程,以期达到降低研制风险的目的。
Research on the Risk Management of High Pressure Compressor Development Project
     It is a common case that the extension of time and the exceedance of investment for engineering projects, since the complicated natural and social circumstances in which engineering projects being carried out, as well as some features included in engineering practices, ie. large investments, long period, high level of complexity, and a variety of risks encountered by participants in each phases of a project. Therefore, Risk management plays a significant role in engineering projects to ensure the targets of engineering projects can be achieved smoothly-to nip troubles in the bud, or to take remedial measures when some risks inevitably happen, which aims to minimize the unexpected loss. In conclusion, risk management is an indispensable part of project management.
     In aviation industry, areo-engine development projects is characterized by long cycle time, high level of difficulty in techniques, knowledge of many subjects to be covered, extensive funds to be needed, demanding standards for national industrial developments, and numerous risks during the developing process. Apparently, project risk management is of great significance in areo-engine development. As the main Power Plant of the aircraft, aviation gas turbine is widely used for various of aircraft, known as the plane "heart". As the core components for aviation gas turbine, High-pressure compressor is crucial for gas turbines,and it's performance directly influences the overall performance of gas turbine. Therefore, the development of high-pressure compressor is very difficulty, and facing the great risk.
     This thesis provides analysis and induction concerning risk management for the High-pressure compressor development project, the risks in the project has been identified and analysed, and indicators for risk monitoring as well as process for risk managing has been set up, which aims to minimize risks in the compressor development projects.
引文
[1]陈伟珂,黄艳敏编著,工程风险与工程保险,天津大学出版社,2005.1
    [2]邱菀华、沈建明、杨爱华编著,现代项目管理导论,机械工业出版社,2002.9
    [3]王忠平,现代项目管理在科技项目中的应用研究,云南省科技信息网,http://www.ynst.net.cn/kjg1/200701230004.htm,2007
    [4]美国项目管理协会,项目管理知识体系指南(第三版),电子工业出版社,2005.9
    [5]王家远,刘春乐,建设项目风险管理,中国水利水电出版社,知识出版社,2004
    [6]柳纯录,刘明亮,信息系统项目管理师教程,清华大学出版社,2005
    [7]张璐玲,软件项目风险管理方法比较和研究,计算机工程,2003.3
    [8]方德英等,IT项目风险管理保障体系设计,商业研究,2006.10
    [9]王树文,如何建立软件项目质量评估体系,中国系统分析员,2005.6
    [10]刘艳玲,项目风险预警系统的构建,建筑管理现代化,2003(4)
    [11]詹景忠,工程项目全面风险管理,世界商业评论,www.icox.com,2004
    [12][美]罗伯特·希斯,危机管理,中信出版社,2000.12
    [13]李斌、赵弋,风险投资项目评估应用方法——项目效益风险比综合评价模型,华东经济管理,2005.19(1)
    [14]陈光,航空发动机结构设计分析,北京航空航天大学出版社,2006.11
    [15]李晓宇,张明玉,张凯,工程项目风险评价体系研究,科技进步与对策,2005.6
    [16]傅为忠,张小莉,李文志,杨善林,工程项目技术风险评价的建模与应用研究,合肥工业大学学报(自然科学版),2004.27(12)
    [17]krichsteiger C. Technical communication on status in developing a compass for risk assessment, Safty Science,2004.42(3)
    [18]王建,黄凤岗,景韶光,AHP中判断矩阵一致性调整方法研究,系统工程理论与实践,2005.(8)
    [19]阎长俊,张晓明,工程项目管理中的风险分析与防范,世界商业评论, www. icox. com,2004
    [20]何伯森,孔德泉,业主方的索赔管理,中国投资与建设,1998.(7)
    [21]徐金凤,董亚辉,项目进度管理,对外经贸大学出版社,2006.12
    [22]李晓曼,工程承包项目中索赔问题的处理,世界商业评论,www. icox. com,2004

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700