Optimal Operation Scheduling of Multiple Pump Units on variable speed operation with VFD in the East Route of South-to-North Water Diversion Project
详细信息    查看官网全文
摘要
In order to reduce the pump electricity cost with the flow demand satisfied, an operation optimization problem is formulated for the third Huaiyin pumping station and the mathematical model of optimal daily operation with variable speed is established with variable speed drive for multiple pump units. With the characteristics of the mathematical model analyzed, an improved dynamic programming algorithm is utilized to reduce the dimensionality of the optimization problem and thus the computation time to facilitate in the practical engineering application. Through the study on the operation of the third Huaiyin pumping station, optimal operation scheduling of multiple pump units with variable frequency drive(VFD) can effectively reduce the electricity cost.
In order to reduce the pump electricity cost with the flow demand satisfied, an operation optimization problem is formulated for the third Huaiyin pumping station and the mathematical model of optimal daily operation with variable speed is established with variable speed drive for multiple pump units. With the characteristics of the mathematical model analyzed, an improved dynamic programming algorithm is utilized to reduce the dimensionality of the optimization problem and thus the computation time to facilitate in the practical engineering application. Through the study on the operation of the third Huaiyin pumping station, optimal operation scheduling of multiple pump units with variable frequency drive(VFD) can effectively reduce the electricity cost.
引文
[1]Y.Gong,J.Cheng,L.Zhang,R.Zhang,Study on operation optimization of pumping station’s 24 hours operation under influences of tides and peak-valley electricity prices.The10TH Asain International Conference on Fluid Machinery,AIP conference proceedings,2010,1225:137-146.
    [2]J.Cheng,L.Zhang,R.Zhang,Y.Gong,Study on optimal daily operation of single adjustable-blade pump unit in pumping station.Journal of Hydraulic Engineering,2010,41(4):499-504.
    [3]G.Mc Cormick,R.Powell,Optimal pump scheduling in water supply sys-tems with maximum demand charges,Journal of Water Resources Planning and Management,2003,129(5):372-379.
    [4]M.Moradi-Jalal,B.W.Karney,Optimal design and operation of irrigation pumping stations using mathematical programming and genetic algorithm(GA),Journal of Hydraulic Research,2008,46(2):237-246.
    [5]S.Pezeshk,O.J.Helweg,Adaptive search optimization in reducing pump operating costs,Journal of Water Resources Planning and Management,1996,122(1):57-63.
    [6]S.Lingireddy,DJ.Wood,Improved operation of water distribution systems using variable-speed pumps,Journal of energy engineering,1998,124(3):90-103.
    [7]C.Wegley,M.Eusuff,K.Lansey,Determining pump operations using particle swarm optimization,Joint Conference on Water Resource Engineering and Water Resources Planning and Management,2000,104:206-206.
    [8]A.Ostfeld,A.Tubaltzev,Ant colony optimization for least-cost design and operation of pumping water distribution systems,Journal of water resources planning and management,2008,134(2):107-118.
    [9]M.Moradi-Jalal,MA.Mari?o,A.Afshar,Optimal design and operation of irrigation pumping station,Journal of Irrigation and Drainage Engineering,2003,129(3):149-154.
    [10]D.Nace,S.Demotier,J.Carlier,T.Daguinos,R.Kora,Using linear programming methods for optimizing the real-time pump scheduling,World Water and Environmental Resources Congress,2012:1-8.
    [11]EDC.Bortoni,RAD.Almeida,ANC.Viana,Optimization of parallel variable-speed-driven centrifugal pumps operation,Energy Efficiency,2008,1(3):167-173.
    [12]Y.Gong,J.Cheng,R.Zhang,Q.Huangfu,Algorithm of optimal with adjustable-blade and variable speed for pumping station,Journal of Drainage and Irrigation Machinery Engineering,2013,31(6):496-500.
    [13]J.Cheng,R.Zhang,D.Deng,Y.Gong,X.Feng,Adaptability research of optimal operation mode with variable frequency drives for pumping stations in china’s eastern route project of S-to-N water diversion,Journal of Drainage and Irrigation Machinery Engineering,2010,28(5):434-438.
    [14]Y.Gong,J.Cheng,R.Zhang,L.Zhang.Optimization on variable speed operation with VFD for No.3 Huaiyin pumping station based on decomposition-dynamic programming aggregation method,Transactions of the CSAE,2001,27(3):79-83.
    [15]H.Zhu,F.Xia,Application of decomposition-aggregation method of large-scale system on whole structural optimization of Arch Aqueduct,Journal of Hydraulic Engineering,1995,26(10):1-7.
    [16]H.Shaaban,L.Gruji?,The decomposition-aggregation method applied to a multimachine power system,Large Scale Systems in Information Decision Technologies,1986,10(2):115-132.
    [17]J.Cheng,L.Zhang,R.Zhang,Y.Gong,H.Zhu,D.Deng,Optimal methodology of single-unit variable speed operation in pumping station,Transactions of the Chinese Society for Agricultural Machinery,2010,41(3):72-76.
    [18]W.Li,X.Zhuan,Optimal operation scheduling of an adjustable-blade pumping station in the east route of South-to-North water diversion project,Journal of Hydraulic Engineering,2016,47(10):1332-1338.
    [19]Y.Gong,Study on some related optimal methods for operation of pumping stations in eastern route of South-to-North water diversion project,Phd,Yangzhou University(June 2011).

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700