BIM技术在联合工房设计及管网建设中的应用研究
详细信息    查看官网全文
摘要
为了提高卷烟联合工房的设计效率与建设质量,避免由于设计缺陷导致诸如管线碰撞、孔洞遗漏、预埋件错位等技术问题的出现,加强成本和工期控制,将具有深层次推理能力的平台级系统管理思路——BIM技术,运用到联合工房的整体设计与建设中。通过模型的构建、管网设计中的冲突检测与优化、工程量自动统计、虚拟漫游与参数查询、施工可视化模拟、运用4D模型的施工冲突分析与管理等手段指导工程实际建设,提高了工程建设质量、加快了工程建设进度、节约了工程投资,使工程技改项目管理由粗放型向集约型转变,助力烟草行业工程技改领域工业化与信息化加速融合。
In order to improve the efficiency of joint workshop of cigarette design and build quality, avoid collis ion such as pipelines, holes due to a design flaw is missing, with embedded displacement technology issues appe ared, strengthening control of cost and duration, will have deeper reasoning abilities of the platform-level syste m management--BIM technology, applied to the overall design and construction of the joint workshop. Through model of building, and tube network design in the of conflict detection and optimization, and engineerin g volume automatically statistics, and virtual roaming and parameter query, and construction Visual of si mulation, and using 4D model of construction conflict analysis and management, means guide engineerin g actual construction, improve has engineering construction quality, and speed up has engineering constru ction progress, and save has engineering investment, makes engineering technical project management by extensive type to intensive type change, power tobacco industry engineering technical field industrializatio n and information accelerated fusion.
引文
[1]黄强.论BIM[M].中国建筑工业出版社,2016;
    [2]薛训明,陈凯等.BIM在合肥卷烟厂全生命周期应用的研究.电脑知识与技术.2014,(1):195-198,222
    [3]薛兆明.BIM协同化设计流程及管理初探.城市建筑.2015,(15):148-148
    [4]王婷,池文婷.BIM技术在4D施工进度模拟的应用探讨.图学学报.2015,36(2):306-311
    [5]丁烈云,龚剑,陈建国.BIM应用与施工[M].同济大学出版社,2015;
    [6]中国建筑科学研究院建研科技股份有限公司.三维建筑工程量自动统计关键技术研究与应用.科技成果数据库.2010
    [7]上海市建筑信息模型技术应用指南[S],2015;
    [8]张建平,胡振中等.基于4D信息模型的施工冲突分析与管理.施工技术.2009,38(8):115-119

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700