川气东送管道工程地质勘察难点及对策
详细信息    查看官网全文
摘要
地质条件复杂的长江等大型穿越工程、鄂西山区岩溶隧道群、滑坡和岩溶塌陷等地质灾害是川气东送管道工程建设中遇到的地质难题。勘察中通过有针对性地应用工程物探、原位测试、水文实验等勘察手段,解决了长江等大型穿越复杂岩土界面和野三河大型跨越的地基稳定性等问题,查明了深埋隧道等控制性工程中的构造破碎带、岩溶特征等地质灾害的地质技术难题,提高了隧道围岩分级的准确率;通过地质灾害排查和不良地质专题勘察,为复杂地质条件下川气东送管道工程的设计和施工提供了可靠岩土参数和依据。
Geological disasters complex geological conditions across the Yangtze River and other large projects,karst mountainous area of western tunnel group, landslides and karst collapse and so is East Gas Transmission Pipeline Construction geological problems encountered in the survey by a targeted application of geophysical prospecting situ testing, hydrology experiment investigation means to solve the Yangtze River and other large complex across the interface foundation geotechnical stability across large and wild rivers and other issues, to identify the long tunnel deep control projects like tectonic fracture zone, karst geological characteristics of the technical problems of geological disasters. Through the investigation of geological disasters and adverse geological thematic survey, geotechnical parameters and to provide reliable basis for the design and construction of the pipeline to Sichuan-to-East Gas under complicated geological conditions.
引文
[1]高河东,祁志江,刘建武,等.川气东送管道工程长江穿越[J].油气储运,2011,30(5).
    [2]方浩.川气东送管道工程沿线地质灾害及防治对策分析[J].中国地质灾害与防治学报,2012,23(3).
    [3]徐帅陵,刘晓忠.九江长江穿越溶洞探查中声学浅地层剖面探测方法的应用[J].石油规划设计,2013,24(2).
    [4]保定新星石化工程有限责任公司.川气东送管道工程利川-恩施段石板岭隧道详细勘察报告[R].2006.11.
    [5]保定新星石化工程股份有限公司.川气东送管道工程(鄂西段)隧道围岩分级变更复核报告说明[R].2009.02.
    [6]宋矿银,张兰青.长距离天然气管道山体隧道勘察方法探讨[J].岩土工程界,2009,12(8).

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700